What do you mean by "Having to say NO"..?
A. Both a & b
B. No, the software is not ready for production
C. No, the problem is not with testers
D. None of the above
正解:B
質問 2:
Given the following figures for the testing on a project, and assuming the failure rate for initial tests remains constant and that all retests pass, what number of tests remain to be run? 3 credits

A. 720
B. 570
C. 700
D. 784
正解:A
質問 3:
The five parts of the fundamental test process have a broad chronological order. Which of the options gives three different parts in the correct order?
A. Implementation and execution, planning and control, analysis and design.
B. Evaluating exit criteria and reporting, implementation and execution, analysis and design.
C. Analysis and design, evaluating exit criteria and reporting, test closure activities.
D. Evaluating exit criteria and reporting, test closure activities, analysis and design.
正解:C
解説: (Pass4Test メンバーにのみ表示されます)
質問 4:
Evaluate the status of the project against the defined exit criteria. Which of the following options shows the correct status? 2 credits
A. Criteria A = OK, criteria B = OK, criteria C = OK
B. Criteria A = OK, criteria B = NOT OK, criteria C = NOT OK
C. Criteria A = NOT OK, criteria B = NOT OK, criteria C = OK
D. Criteria A = NOT OK, criteria B = NOT OK, criteria C = NOT OK
正解:C
質問 5:
Which is not the testing objective?
A. Finding defects
B. Preventing defects.
C. Gaining confidence about the level of quality and providing information
D. Debugging defects
正解:D
質問 6:
During which test activity could faults be found most cost effectively?
A. Check Exit criteria completion
B. Design
C. Planning
D. Execution
正解:C