A client has a PureFlex system and needs to upgrade their Flex System V7000 Storage Node. Which interface would be used to accomplish this?
A. Chassis Manager
B. BIOS upgrade
C. Flex Node Interface GUI
D. FSM
正解:D
質問 2:
The current phase of their modernization effort is focused on upgrading their servers. Which action best addresses the client's requirement?
A. Arrange a visit to the closest IBM Briefing Center so they can see the latest releases of the compute nodes
B. Propose IBM's Flex nodes that support all appropriate connectivity options to connect to the existing storage
C. Find out what Cisco, HP, and Dell are bidding and build an IBM Flex solution to match them at lower costs
D. Propose the x222 Flex nodes because they will provide the most cost effective solution
正解:B
質問 3:
Given this MSP's desire for rapid deployment of additional capacity, the sales team chose to lead with a PureFlex solution; however, in the interest of keeping costs down, they chose to propose a PureFlex Express configuration. For high availability, they added a second IBM Flex System Fabric EN4093R 10Gb Scalable Switch. Each PureFlex configuration comes with at least four 1000Base-T SFP RJ45 Transceivers that are used to connect the CMMs and (if present) the Storwize V7000 management ports to the EN4093R switch in the chassis. What simple change can be made after installation to simplify the connectivity and improve management network availability without adding additional cost?
A. Leverage two more 1000Base-T SFP RJ45 Transceivers for redundant connectivity to the client management network
B. Separate each of the CMM and Storwize V7000 management ports so that they are divided across the two available EN4093R switches
C. Completely eliminate the use of the 1000Base-T SFP RJ45 Transceivers by routing management traffic across a separate VLAN on theproduction network links
D. Connect CMM and (if present) the Storwize V7000 management ports directly to the client management network
正解:D
質問 4:
A cost conscious client wants to purchase a two POWER node PureFlex solution. Each node will have 16 cores, two AIX LPARs, and they need four ports of FCoE communications. A critical requirement is there can be no single point of failure. Which solution will meet all the client's requirements?
A. p270
B. p260
C. p460
D. p24L
正解:C
質問 5:
A hardware error is automatically reported to IBM. An IBM Flex System Fabric EN4093R switch with upgrade 2 needs to be replaced. The technician is going to the client with the new switch and replaces the switch. What additional step must be taken for the new switch to be operational?
A. Buy Upgrade 1 and Upgrade 2 again to link this with the new part number of the new switch and configure the switch by hand
B. Request a new Upgrade license key via the Features On Demand webpage and configure the switch by hand
C. Do nothing; the switch configuration is automatically copied from the Flex System Manager to the switch including the upgrade licenses
D. Configure the new switch by hand and copy the old upgrade licenses onto the new switch
正解:B
質問 6:
A client has expressed a desire to utilize an existing current model HMC to manage Power compute nodes in a Flex Chassis which also contains x86 compute nodes and an IBM Flex System V7000 Storage Node. The client also stated the ability to have SAN zones automatically built when creating storage volumes is more important in this environment. How should a technical expert respond to these statements?
A. Use an FSM and an HMC to manage the individual tasks.
B. Utilize only an FSM to manage the entire environment.
C. Install the IBM Network Advisor Power Compute Node plugin into the HMC.
D. An HMC used with IBM Network Advisor will satisfy both requirements.
正解:B
質問 7:
The IBM Flex System Interoperability Guide is a handy reference document but its information is only as accurate as of its most recent publication date. Where would the technical expert find the latest complete information on supported FCoE configurations?
A. Reference IBM's ServerProven web page
B. IBM System Storage Interoperation Center (SSIC)
C. IBM Flex System product development
D. The FC-BB-5 standards documentation
正解:B