In which scenarios do you need to use SUM 2.0 instead of SUM 1.0?
There are 2 correct answers to this question.
Response:
A. SAP S/4HANA conversion to SAP S/4HANA 1709
B. Upgrading to SAP ECC 6.08 without using DMO
C. Updating to SAP ECC 6.07 using DMO
D. Using DMO when applying Support Packages to SAP ECC 6.07
正解:A,B
質問 2:
You are performing an SAP S/4HANA conversion of the development system. Which credentials do you use in which system to perform the adjustment of programs and other non-dictionary repository objects (SPAU)?
Please choose the correct answer.
A. Credentials of user DDIC in the development client of the development system
B. Credentials of a named user in client 000 of the shadow system
C. Credentials of user DDIC in client 000 of the shadow system
D. Credentials of a named user in the development client of the development system
正解:D
質問 3:
What do you need to know about the SAP ERP Upgrade and Update Guide?
There are 2 correct answers to this question.
Response:
A. It contains a troubleshooting section
B. It contains a section "free space requirements"
C. It is a database-specific document
D. It is target release specific
正解:B,D
質問 4:
You want to execute a Unicode Conversion only. Which approach do you need to follow?
Please choose the correct answer.
Response:
A. SUM without DMO
B. SWPM using the Load procedure
C. SUM with DMO
D. SWPM using the Backup / Restore procedure
正解:B
質問 5:
You are performing an SAP S/4HANA conversion. You are in the BIND_PATCH phase of the Configuration roadmap step. For some software components, you find entries in the Calculated level column. What does the Calculated level indicate for those software components?
A. The SAP support packages that will be bound to the conversion
B. The SAP support packages in the download directory that are newer than the selected support package stack
C. The SAP support packages contained in the upgrade media, calculated by the maintenance planner
D. The SAP support packages of the support package stack, calculated by the maintenance planner
正解:B
質問 6:
In ICNV. How database operations synchronized between the source and the target table?
A. AA
B. Deletes are directly executed in the target table by delete trigger.
正解:B
質問 7:
You want to perform custom code check via ABAP test cockpit in preparation of your SAP S/4HANA conversion? What kind of SAP System can you use to generate the custom code migration worklist?
A. A Standalone SAP system with ABAP 7.51 or above
B. An SAP S4HANA 1709 sandbox system
C. AA
正解:A,B
質問 8:
Which circumstances will allow SUM to run without the creation of a shadow system?
Please choose the correct answer.
Response:
A. Using the main configuration option "Standard" when applying SAP Support Packages
B. Using the database migration option (DMO) for SUM
C. Using the main configuration option "Single System" in case of an upgrade.
D. Using the main configuration option "Single System" when installing an Add-On
正解:D