Which VIO Server command lets an administrator enter a non-restricted root shell to allow environment setup and installation of vendor software?
A. oem_setup_env
B. oem_env_setup
C. setup_oem_env
D. env_oem_setup
正解:A
質問 2:
A processor upgrade to a new 4-core Power 720 is planned, with processors capped and shared processor pools enabled, using the following configuration:
IBM i: Minimum - 1 .0; Desired - 2.5; Maximum - 2.5
Linux: Minimum - 0.5; Desired - 1.0; Maximum - 1.0
AIX: Minimum - 0.5; Desired - 0.5; Maximum - 1 .0
How many processor entitlements for IBM i are required on the new system?
A. 4
B. 1
C. 3
D. 2
正解:C
質問 3:
A customer is experiencing disk performance issues on a client IBM i LPAR. The hosting IBM i partition is utilizing 50 internal disks. Both the host and the client partition disks are less than 50% full.
Which option is most likely to improve performance of the client IBM i partitions?
A. Utilize smaller Network Server Storage Spaces, but the same quantity.
B. Utilize a user ASP for the Network Server Storage Spaces.
C. Increase the queuing depth of the disks to the maximum allowed.
D. Use the STRASPBAL *USAGE utility.
正解:B
質問 4:
A Power 720 administrator is going to create a new partition on a machine with 3 existing partitions. The machine has 2 processors in a Shared Processor Pool. The three partitions as defined below for their processor requirements are active, utilizing the Desired processing units.

What is the effect of configuring partition LPAR4 as follows using the same processor pool?

A. LPAR4 will start but only receive 0.2 of a processor.
B. LPAP4 will not start since there is not enough processor capacity to satisfy the minimum.
C. All the partitions in the Shared Processor Pool will have their desired processing units reduced by .1 when LPAR4 is activated.
D. LPAR4 profile cannot be saved until the maximum is set to 0.8 or less.
正解:B
質問 5:
An administrator wants to share a fibre attached TS3100 tape library between multiple IBM i 7.1 partitions. The system contains a PC #5774 - 4Gb fibre adapter and uses an IBM fibre switch. All IBM i partitions are hosted by VIO Server (VIOS).
How could the administrator configure the sharing of the tape library?
A. Configure NPIV within VIOS, then configure each partition to use NPIV to share the tape library.
B. In the HMC, select the VIOS partition, then select Operations - Schedule Operations - Options New. Create a new Scheduled Dynamic Reconfiguration operation to move the fibre adapter between partitions.
C. In the HMC, select the host Power System, then select Operations - Schedule Operations New. Create a new Scheduled Dynamic Reconfiguration operation to move the fibre adapter between partitions.
D. Create a script that can be called after each backup job in a partition finishes, which will move the fibre adapter to the next partition
正解:D
質問 6:
An administrator is planning to update a POWER blade server managed with Integrated Virtualization Manager (IVM) from version 1.5 to version 2.2
What should the administrator take into consideration?
A. All client partitions should be shut down before starting the migration to avoid data corruption.
B. The migration can only occur using a Serial Over LAN (SOL) console.
C. The administrator should use the Advanced Management Module (AMM) interface to specify the location of the migration DV
D. The partition profile data will need to be saved before the migration and restored once the migration is complete.
正解:A
質問 7:
What type of server and client adapters must be configured on the HMC to support virtualized disk presented from a V7000 SAN to an IBM i client partition?
A. One vSCSI server adapter One vSCSI client adapter
B. One SCSI server adapter One ISCSI client adapter
C. One Fibre Channel server adapter One Fibre Channel client adapter
D. One NPIV server adapter One NPIV client adapter
正解:A
質問 8:
Which PowerVM feature can be used to enable an IBM i partition to IPL from an iBase_01 image?
A. Remote Image Catalog over NES
B. Remote Image Catalog through QFileSvr.400
C. Virtual optical through Network Server Description
D. VirtualMedia Repository
正解:D
質問 9:
When configuring a bridged-virtual-Ethernet-to-physical-Ethernet environment, what value determines which bridge will serve as primary and which as secondary?
A. Priority value
B. Queuing value
C. Class of Service value
D. Quality of Service value
正解:A
Suzuki -