
The current phase of their modernization effort is focused on upgrading their servers. Which action best addresses the client's requirement?
A. Arrange a visit to the closest IBM Briefing Center so they can see the latest releases of the compute nodes
B. Propose IBM's Flex nodes that support all appropriate connectivity options to connect to the existing storage
C. Find out what Cisco, HP, and Dell are bidding and build an IBM Flex solution to match them at lower costs
D. Propose the x222 Flex nodes because they will provide the most cost effective solution
正解:B
質問 2:
Exhibit:

The technical expert is designing a solution to replace the existing server environment. What configuration will most likely be successful in a highly competitive bid scenario?
A. Flex System with existing XIV externally virtualized by Storwize V7000
B. Flex System using existing XIV and Brocade SAN
C. PureFlex Enterprise with existing XIV externally virtualized by Flex System V7000
D. PureFlex Express with Storwize V7000 used to virtualize the XIV
正解:B
質問 3:
A client wants to purchase a PureFlex solution. Their solution will require 24 ports per Power node to meet their I/O needs. With cost as a consideration, which node will meet the client requirements?
A. A 32-core p460 node with four CN4093 switches
B. A 24-core p270 node with four CN4093 switches
C. A 16-core p24L node with two each EN4093 and FC5022 switches
D. A 24-core p270 node with two each EN4093 and FC5022 switches
正解:A
質問 4:
A client has a need for a Linux based solution that requires a large amount of memory. The application runs on either x86 or Power nodes. Which of the following nodes would provide the maximum memory configuration?
A. x240
B. x440
C. p460
D. p24L
正解:B
質問 5:

IBM 000-784 Exam
A client wants to provide a Flex solution that compares to a standard Power 750 running PowerVM and AIX. The client asks for a Flex System compute node with similar capacity and scalability for processor and memory. Which node should be discussed with the prospect?
A. Flex node p24L
B. Flex node p460
C. Flex node p270
D. Flex node p260
正解:B
質問 6:
A client wants to use the provisioning features of the FSM to deploy Virtual Machines on their p260 compute nodes. They want to use the Storage Copy Services in the Flex System V7000 Storage Node to achieve this. In this configuration where would the appliance image repository be configured?
A. Virtual I/O Server
B. SmartCloud Entry
C. NIM Server
D. FSM
正解:A
質問 7:
A client has an implementation of SmartCloud Entry 2.1, and they want to install several features of Microsoft Hyper-V including Flavor management and IPv4/IPv6 network management. How can the client accomplish this?
A. Upgrade to SmartCloud Entry 3.1
B. Install Microsoft Assessment and Planning (MAP) Toolkit for Hyper-V
C. Install Microsoft Hyper-V Integration Services
D. Upgrade to SmartCloud Entry 2.4
正解:A
七村** -
口コミを見てIBMさんのこのC4120-784の問題集を買いました、入り口の入り口である基本的なところまで説明してありとても解りやすいと思いました、買ってよかったです