A project team has three principal participants with LEED AP credentials. One is an energy modeler, one is a civil engineer and the third one is a general contractor. Under which category can their credentials contribute a point?
A. Innovation
B. Sustainable Sites
C. Commissioning (Cx)
D. Energy and Atmosphere
正解:A
解説: (Pass4Test メンバーにのみ表示されます)
質問 2:
The protection and restoration of natural vegetation, wetland areas and bodies of water through building footprint consolidation helps to
A. minimize hardscape
B. prevent light pollution
C. support conservation programs
D. preserve open space and sensitive areas
正解:D
解説: (Pass4Test メンバーにのみ表示されます)
質問 3:
Which of the following is a type of quality transit in LEED?
A. Single passenger car
B. Taxi
C. Motorcycle
D. Bicycle
正解:D
解説: (Pass4Test メンバーにのみ表示されます)
質問 4:
What is pre-consumer recycled content?
A. Virgin material that is not utilized in production
B. Waste material that is generated by households or by commercial use
C. Waste material that is generated from factories
D. Waste material that is diverted from the waste stream during the manufacturing process
正解:D
解説: (Pass4Test メンバーにのみ表示されます)
質問 5:
Which of the following promote the thermal comfort of occupants?
A. High cubicle partitions and large window-to-wall ratios
B. Adjustable temperature with ventilation control
C. Adjustable blinds and light shelves
D. Dimmable lighting and daylighting
正解:B
解説: (Pass4Test メンバーにのみ表示されます)
質問 6:
The result of proper design and operation of buildings and neighborhoods is an increase in energy
A. efficiency
B. supply
C. consumption
D. demand
正解:A
解説: (Pass4Test メンバーにのみ表示されます)
質問 7:
Which of the following contribute to the triple bottom line?
A. Project balance sheet
B. Global security
C. Social responsibility
D. Green metrics and verification
正解:C
解説: (Pass4Test メンバーにのみ表示されます)
質問 8:
Which strategy is an example of permanent entryway systems used to reduce dust, dirt and contaminants brought into a facility?
A. Installing outdoor air monitoring equipment
B. Conducting a thermal comfort survey
C. Providing sensors at all entrances
D. Placing grilles, grates or mats at all major entrances
正解:D
解説: (Pass4Test メンバーにのみ表示されます)
質問 9:
In order to earn LEED certification, a project must
A. employ a LEED AP on its project team
B. conduct a whole-building life-cycle assessment
C. satisfy all prerequisites and earn a minimum number of points
D. earn a minimum 0t 50 points or meet a prerequisite
正解:C
解説: (Pass4Test メンバーにのみ表示されます)
Oishi -
必要な知識をしっかり身に付けることができる。これ問題集一つで合格できるって本当ですね。