A developer is lookingfor a site to construct a LEED for Neighborhood Development project.Which contextual attribute would most contribute to gaining this certification?
A. Previously disturbed land surrounding the site
B. A site with waterfront as part of its boundary
C. A load utility that supplies renewable energy to the site
D. A nearby office park
正解:C
解説: (Pass4Test メンバーにのみ表示されます)
質問 2:
A developer is trying to calculate it a property qualities as an adjacent site. When considering the bordering land alongthe property boundary, which ofthe following borders can be omitted from the calculation?
A. A border along a lake
B. A public street or other right-of-way
C. A wetland bordering the site
D. A bordering site that Is previously disturbed
正解:B
解説: (Pass4Test メンバーにのみ表示されます)
質問 3:
Which of the following approaches contributes to achieving a point under Neighborhood Pattern and Design Credit. Community Outreach and Involvement?
A. Create and maintain an interactive website for discussion between the developer and the community throughout the duration of the project
B. Conduct a telephone survey of users of similar projects in the same region
C. Conduct a one day design charrette or interactive workshop with the design team and client
D. Present the project and solicit community Input at an open house during construction
正解:A
解説: (Pass4Test メンバーにのみ表示されます)
質問 4:
A LEED tot Neighborhood Development project team may need to contact or use reference materials from the
U.S. Environmental Protection Agency of local equivalency outside the US. Regarding.
A. brownfield locations and designations.
B. locating a community supported agricultureprogram
C. floodplain standards
D. designations of uniqueor prime soil types
正解:A
解説: (Pass4Test メンバーにのみ表示されます)
質問 5:
A project Is planning a new bus service and shelters to service a new community. Which of the following would be required to meet the Neighborhood Pattern and Design Credit. Transit Facilities?
A. Provide a park and ride parking, lot within 150 ft. (46 m) ofthe transit shelter
B. Provide points of connectivity of 140 street intersections per square mile
C. Transit agency confirmation that additional weather protected transit shelters will be provided within five years of protect completion.
D. Display transit schedules and route information at each publictransit stop
正解:D
解説: (Pass4Test メンバーにのみ表示されます)
質問 6:
A developer has built a snow storage system that uses snow collected in the winter to cool water that serves the neighborhood central plant during the summer.Which credit will this system contribute to?
A. Green Infrastructure and Buildings Heal Island Reduction
B. Green Infrastructure and Buildings. Renewable Energy Production
C. Green Infrastructure and Buildings. Outdoor Water Use Reduction
D. Green Infrastructure and Buildings. Optimize Building Energy Performance
正解:D
解説: (Pass4Test メンバーにのみ表示されます)
質問 7:
What information is required to determine if a project quality for the Green Infrastructure and Buildings Credit. Wastewater Management?
A. Rainwater reuse rate
B. Average amount of annual wastewater generated
C. Cost of installing wastewater system
D. Ability to connect to existing wastewater infrastructure
正解:B
解説: (Pass4Test メンバーにのみ表示されます)
質問 8:
According to Green Infrastructure and Buildings Prerequisite. Indoor Waler Use Reduction, the indoor water usage of a new building or buildings undergoing major renovations (nonresidential buildings, mixed-use buildings, and multifamily tour stones or more), must average at least
A. 20% less thanin baseline buildings.
B. 10% less than in baseline buildings.
C. 50% less than in baseline buildings.
D. 30% loss than in baseline buildings
正解:A
解説: (Pass4Test メンバーにのみ表示されます)
Ogata -
試験参考書のおかげで、順調にLEED-AP-ND試験をパスしました。簡単になります。いい資料です!