Which of the following la an eligible source of renewable energy tot Green Infrastructure and Buildings Credit. Renewable Energy Production?
A. Combust on of municipal solid waste
B. Ground-source Heat pump
C. Wind energy
D. Forest biomass waste other than mill residue
正解:C
解説: (Pass4Test メンバーにのみ表示されます)
質問 2:
A project team has achieved the require men is for Neighborhood Pattern and Design Credit. Community Outreach and Involvement. Option 1: Community Outreach. Which of the following additional actions would earn the project a total or two points?
A. Conduct an Interactive workshop open to the public for at least two days
B. Modify Die projects conceptual design as a direct result of community input
C. Establish ongoing moans for communication between the developer and the community
D. Obtain full entitlement and endorsements from the local land use and Building permitting jurisdictions
正解:C
解説: (Pass4Test メンバーにのみ表示されます)
質問 3:
What Is the existing or granted right to use property for specific types and quantities of land uses?
A. Development Agreement
B. Building Permit
C. Entitlement
D. Certificate of Occupancy
正解:C
解説: (Pass4Test メンバーにのみ表示されます)
質問 4:
A project team would like to attempt the credit Transit Facilities' and is working with the local transit agency to inventory the existing and proposed bus stops within the project boundary. Oi the five proposed bus stops, one stop will be in operation at the same time when the project completes, and two stops will be in operation in the second year alter the project's completion. The remaining two bus stops will be in operation m me third year after the project's completion. How many proposed bus stops can the project team Include in the application form to attempt the credit?
A. Two
B. One
C. Three
D. Five
正解:B
解説: (Pass4Test メンバーにのみ表示されます)
質問 5:
Winch of thefollowing rating method can beused to determine the performance of luminaires for Green Infrastructure and Buildings Credit. Light Pollution Reduction?
A. Light emitting diodes
B. edema index
C. Backlight-uplight-glare
D. illuminating Engineering Society. Stage A Evaluation
正解:C
解説: (Pass4Test メンバーにのみ表示されます)
質問 6:
What factor determines the percentage of undeveloped land that must remain undisturbed for Green Infrastructure and Buildings Credit. Minimized Site Disturbance?
A. Density of the project
B. intersections per square mile
C. Covenants, conditions, and restrictions
D. City land development codes
正解:A
解説: (Pass4Test メンバーにのみ表示されます)
質問 7:
What information is required to determine if a project quality for the Green Infrastructure and Buildings Credit. Wastewater Management?
A. Rainwater reuse rate
B. Average amount of annual wastewater generated
C. Cost of installing wastewater system
D. Ability to connect to existing wastewater infrastructure
正解:B
解説: (Pass4Test メンバーにのみ表示されます)
質問 8:
A project site is located in a Federal Empowerment Zone What Is also needed to qualify the protect tor Smart Location and Linkage Credit. Preferred Locations Option 3: Designated High-Priority Locations?
A. Locate the project such that 50% of its dwelling units are within a 1/4 ml.(0.4 km) walking distance of at least seven diverse uses
B. Provide 10% of total rental units priced up to 60% area median income (AMI)
C. Use no more than 20% of the total development footprint area for off-street surface parking, with no individual surface parking lot larger than two acres (0.8 hectare)
D. Locate the project on an adjacent site that is also a previously disturbed site
正解:B
解説: (Pass4Test メンバーにのみ表示されます)
1032 お客様のコメント





Yano -
内容が充実していて助かりました。このLEED-AP-ND問題集で受かりそうです。一からの学習にも試験直前の学習にも使えるLEED-AP-ND問題集だと思う。