What type of Ethernet adapter is supported in an IBM i partition when using Live Partition Mobility?
A. Host Ethernet Adapter (HEA)
B. EtherChannel Adapter
C. Shared Ethernet Adapter (SEA)
D. Virtual Ethernet Adapter
正解:D
質問 2:
What are two methods to determine the partition to which virtual disks are assigned?
A. In VIQ Server, use the Isctg -vI command In IBM i, use the WRKHWDRSC *STG command
B. In VIO Server, use Ispv-AvI In the HMC command line, use Isvdev-p
C. In VIO Server, use Isdev-v command In IBM i, use WRKCFRGSTS *DEV* VRT
D. In VIO Server, use the Ismap command In the HMC GUI use Virtual Resources/Virtual Storage Management
正解:D
質問 3:
An operator shut down an operating IBM i partition from the HMC. What is the result of this action?
A. RAID integrity may be compromised.
B. The next IPL of the partition will be an abnormal IPL.
C. Objects in disk IOA write cache will be lost.
D. The next IPL will need to be manual and will require a Reclaim Storage to complete.
正解:B
質問 4:
A customer is implementing a new POWER7 system that will run along with an older POWER5 system.
A new HMC has been purchased for the POWER7 system.
The older 7310-CR3 HMC for the POWER5 system will remain in service.
The customer wants the older 7310-CR3 provide back up to the new HMC.
What must be done prior to implementing the customer's requirements?
A. Ensurethe POWER7 ESP is running in "Dual Mode"with the"Activated Level"setto supportthe
POWER7 system and the "Deferred Level"set to support the POWER5 system.
Connect the 731 O-CR3 with the "Deferred Level"password.
B. Upgrade the POWER5 system firmware to the same fix pack level that the POWER7 system is
running. Upgrade the 7310-CR3 to the latest version of HMC code.
Connect both systems normally to the 7310-CR3
C. Consult the HMC / Firmware Supported Combinations chart to obtain the proper firmware/HMC
code levelsimplementthe firmware updates on the POWER5 and 7310-CR3 HMC first,
Connectthe 7310-CR3 to the POWER7 system.
D. Connect the new HMC to the POWER7 system and to the LAN.
Use the "Transmit Service Information"dialog on the new HMC to update the 7310-CR3 with the
new HMC code and firmware for the FSP.
Update the firmware on the POWER5 system and connect the new HMC.
正解:C
質問 5:
A customer needs to replace a failed tape controller card on a running partition. The service action Serviceability-> Hardware -> Exchange ERU has been started. The card has been selected and the service action has been launched.
The message "The requested service action cannot currently be completed from this management console" is displayed.
What is the most likely reason for this error?
A. The adapter has not been deallocated from the partition.
B. The tape device associated with the adapter is notvaried off.
C. The service domain for the partition is still active.
D. The partition is controlled by another HMC in the environment.
正解:D
質問 6:
A customer currently has a client IBM i 7.1 environment, being hosted by a partition running IBM i
6.1. Due to increased availability requirements, they would like to take the client environment and restore it to its own single-image system.
How can this be performed with least downtime?
A. On the client partition, perform a SAVE 21.
Restore the saved partition to the new system.
B. Upgrade the hosting partition to IBM i 7.1.
On the client partition, perform a SAVE 21.
Restore the system to the new system.
C. On the hosting partition, save the network server storage spaces forthe client partition. On the
new server, install the Licensed Internal Code from DVD.
Restore the remainder of the system using the storage spaces.
D. Upgrade the hosting partition to IBM i 7.1.
Save the network server storage spaces for the client partition.
On the new server, install the Licensed Internal Code from DVD.
Restore the remainder of the system using the storage spaces.
正解:A