An administrator is designing a client IBM i partition, which will require 1 .4TB of storage, hosted from another IBM i partition. The administrator will configure each virtual disk as 70GB. In addition, the hosting partition will provide the CD and share the internal tape.
What is the minimum number of vSCSI adapters that will need to be defined in each of the client and hosting partitions?
A. 4
B. 1
C. 3
D. 2
正解:D
質問 2:
When using SAN flash copy to clone a disk image for an IBM i client LPAR, message 'CP1096E Disk unit connection is missing' appears in the history log of the newly created client LPAR.
A check in SST shows the expected disk paths as 'active' and extra disk paths with a status of 'missing', a result of the reconfiguration of the disk subsystem.
What is necessary to avoid the warnings and to clean up the disk paths?
A. Re-IPL the system.
B. Remove the missing path(s) through Hardware Service Manager.
C. Run the multipath resetter Advanced Analysis macro in SST.
D. Use the Disk Path Manager tool in System Director Navigator.
正解:C
質問 3:
Additional SAN disk volumes have been dynamically presented to a VIO Server (VIOS) partition, and these resources need to be mapped to an IBM i partition. In order for these resources to be visible in the VIOS partition, what is the appropriate next step?
A. Add an SCSI device in the HMC for the client partition.
B. As padmin, run cfgmgr in the VIOS partition.
C. Run the cfgdev command in the VIOS partition.
D. Use the Disk Management function in System Management Services (SMS).
正解:C
質問 4:
In the following output from an IBM i partition from a POWER7 server, Simultaneous Multi-Threading (SMT) functionality in turned on:

How many processors are reported to the partition?
A. 8
B. 4
C. 16
D. 2
正解:A
質問 5:
A customer would like to share a tape adapter between two partitions. The time of day which the save completes varies significantly on one of the partitions. What is the most appropriate way to move the tape resource to avoid failures and resource contention?
A. Use a repeating scheduled job on the HMC to move the I/O resource.
B. Use a script to be run from the partitions to access the HMC and move the I/O resource after the saves have completed.
C. Afterverifyingthe save has completed, manually move the I/O resource to the next partition profile on the HMC.
D. Schedule the activation of a different profile on the HMC to allow for "desired"resources to become "required."
正解:B
質問 6:
A hosted IBM i partition with SAN-based disk is to be configured with mirrored disks. In order to maximize performance of the partition, where should the disk mirroring be performed?
A. In the IBM i partition
B. In the SAN Volume Controller
C. In the disk subsystem
D. In the VIO Server partition
正解:C