A customer has an HMC-managed Power Systems server with 6 partitions. Four production partitions are subject to varying workloads throughout the day, and two are used for development and testing. The production applications have different licensing limitations on the number of physical cores that may be used. The development partitions can use no more than 1 core. The customer would like to dynamically optimize processor utilization within the licensing limits, with minimal operator intervention. Which of the following meets the customer requirement?
A. Define the production partitions' maximum CPU to the licensing limitations.
Define the development/test partition maximums to one core. Configure each partition to be
capped.
B. Create a shared processor pool for each production partition, with the maximum processor limit
set to the licensing limit for the application in the pool. Assign the development and testing
partitions to a processor pool with a maximum of 1 core. Configure each partition to use uncapped
processing.
C. Define the production partitions' maximum CPU to the licensing limitations.
Define the development/test partitions to use no more than one core. Configure the HMC
scheduler to dynamically assign processors among the pools over a day.
D. Define the production partitions' maximum CPU to the licensing limitations.
Define the development/test partition maximums to one core. Configure each partition to be
uncapped.
正解:B
質問 2:
What is the minimum required to support Active Memory Sharing (AMS)?
A. PowerVM Enterprise Edition
B. Systems Director Enterprise Edition
C. PowerVM Standard Edition
D. Systems Director Standard Edition
正解:B
質問 3:
A customer is planning a pair of Power 770 systems with multiple identical partitions. There are redundant HMCs and Flexible Service Processors (FSPs). What is IBM's recommended network configuration for this situation?
A. Configure the HMC private network to access the FSP1 ports on a dedicated LAN segment and the FSP2 ports to the public network.
B. Configure each HMC and all FSP ports to use a static address on each of the local LANs. Provide one virtual LAN.
C. Configure the first port on the FSPs to one HMC and the second port on the FSPs to the second HMC on private LAN segments. Configure another network segment for regular traffic.
D. Configure the HMC and the first FSP ports to a local dedicated LAN segment. Configure the second FSP ports and the 'public' HMC port to the customer network.
正解:C
質問 4:
A system administrator has been instructed to attach storage in their client LPARs, in a Power 770, with fibre channel adapters using N_port ID virtualization (NPIV).Which of the following partitions has the minimum requirements to utilize virtual fibre channel?
A. LPAR-D with 8Gb FC HBA and SAN connection
B. LPAR-C with 4Gb FC HBA and SAN connection
C. LPAR-B with 2Gb FC HBA and SAN connection
D. LPAR-A with 1Gb FC HBA and SAN connection
正解:A
質問 5:
A customer has a Power 750 with the following: One processor card with 8 cores enabled, and 64GB RAM installed One GX+ adapter with one I/O drawer attached One 4-port 1Gbps IVE adapter PowerVM Standard Edition They need to add a GX++ adapter and cable it to an I/O drawer.
Which of the following must also be ordered?
A. An additional cable-management arm
B. PowerVM Enterprise Edition
C. A second processor card
D. A second IVE adapter
正解:C
質問 6:
A customer is evaluating PowerVM capabilities for dynamically allocating resources without rebooting LPARs. Which features of PowerVM support the customer requirement?
A. CoD and PCI hot-plug
B. Dynamic processor failure and processor instruction retry
C. DLPAR and Active Memory Sharing
D. Hot node add and hot node repair
正解:C
質問 7:
What is an advantage of using an HMC rather than IVM for system management?
A. Support for a single VIO Server environment
B. Supports multiple Power Systems servers from a single point of control
C. Interfaces with Systems Director to manage the Power Systems servers
D. Adapters can be dedicated or virtual for each LPAR environment
正解:B
質問 8:
A customer has 4 application and 2 database servers that will be installed in partitions on a Power
750. They are concerned that the database software vendor will charge based on every processor core in the server.Which action will reduce the potential vendor software costs?
A. Create workload partitions for the database servers.
B. Create virtual processors equal to the entitlement for database servers.
C. Create a separate shared processor pool for the database servers.
D. Create capped partitions for the database servers.
正解:C
牧*泉 -
思考過程では、Pass4Test実際の000-106予備試験合格者の思考をできる限り丁寧に記述。
合格者が、問題を見てどのような思考を経たうえで答案を作成しているかが追体験できる。