What information can be used to manage project scope?
A. Requirement attributes and their values
B. Supplementary requirements
C. Limiting the number of subflows in each use case
D. Relationships between actors and use cases
正解:A
質問 2:
Given: A customer service system is being developed for a telephone company to record and answer questions about telephone installations. Which of the following are system features? (Select all that apply.)
A. Accommodates simultaneously entry of information from up to 100 installers
B. Runs on the Windows 95 operating system
C. Produces status reports about telephone installations
D. Includes a Phone Installer class
正解:A,B,C
質問 3:
The glossary is started at the beginning of what phase?
A. Inception
B. Elaboration
C. Transition
D. Construction
正解:A
質問 4:
Which of the following are artifacts in the requirements process? (Select all that apply.)
A. Change control board
B. Vision document
C. Pareto principle
D. Use-case model
正解:B,D
質問 5:
In a "suspect traceability link," what characterizes the link between the two requirements?
A. Either requirement is unstable.
B. The requirements traced to has changed.
C. Either requirement has changed.
D. The requirements traced from has changed.
正解:C
質問 6:
Why is a Requirements Specification also known as a "customer's proxy"?
A. Customers outline the Requirements Specification.
B. Customers vote on whether to include a particular requirement.
C. Customers pay to have the developers write the detailed Requirements Specification.
D. Customers use the Requirements Specification to specify what they want.
正解:D
質問 7:
What information about a proposed system is usually found in a Supplementary Specification?
A. Non-functional requirements
B. Sub-components
C. Testing procedures
D. Data values
正解:A