Which of the following properties applies to multi-site planning in SAP ECC?
A. Both withdrawal from an alternative plant and stock transfer from another plant are defined via special procurement keys.
B. Multi-site planning can be activated using the corresponding planning strategy.
C. When using one-step stock transfer posting, transfer stock is created in the receiving plant.
D. The use of "scope of planning" is always mandatory for multi-site planning.
正解:A
質問 2:
After a material has been included in a NETCH material requirements planning run you change its BOM (bill of materials).
Which of the following planning file entries for this material are set by the system?
A. The BOM explosion, the NETCH, and the NETPL planning indicators
B. The NETCH and NETPL planning indicators
C. The BOM explosion and the NETPL planning indicator
D. The BOM explosion indicator
正解:A
質問 3:
Which functions can be triggered before releasing a production order?(Choose three)
A. Selection of a BOM
B. Scheduling
C. Selection of a routing
D. Confirmation
E. Stock determination
正解:A,B,C
質問 4:
Which of the following master data can be used with process orders?(Choose three)
A. Serial numbers
B. Resources
C. Master recipes
D. Production/resource tools
E. Production versions
正解:B,C,E
質問 5:
In the SAP ECC system, a material is produced using production orders. The planning table for repetitive manufacturing should be used to plan line loading for this material. On the initial screen of the planning table, you select this material and then receive a message informing you that you cannot use the planning table for this material (see attached screenshot).

What could be the reason?
A. There are no planned orders or production orders present.
B. There are no requirements present.
C. There is no valid production version for this material.
D. The repetitive manufacturing indicator has been set.
正解:C