A System z customer technical staff is planning to upgrade their z9 to a new z114 with a Migration Offering. The customer group is discussing their plan with the System z technical specialist. Which of the following customer statements is in error and must be corrected by the technical specialist?
A. The post installation plan should include disaster recovery considerations including emergency generators for operations, lighting and cooling.
B. The plan must include an accurate measurement of the z114 performance and capacity.
C. The post installation plan should consider that the z114 might have to be taken out of service for micro code updates
D. For a Migration Offering upgrade the existing mainframe and parts must be returned to IBM within 120 days of the z114 ship date.
正解:D
質問 2:
A customer is considering a z196 with a zBX. Which of the following is the best action a specialist could take to ensure customer satisfaction?
A. Conduct a "Fit for Purpose Study"
B. Mentor the customer on installing PowerVM and VMware
C. Conduct a z/VM Implementation Workshop
D. Review the hardware support process and the HMC documentation for the z196 CPC and the zBX
正解:A
質問 3:
Which of the following is a key benefit to customers who deploy zEnterprise compared to other solutions?
A. A management solution for the complete mulit-vendor infrastructure within a datacenter.
B. A hypervisor and hardware management across multiple platforms.
C. A hypervisor infrastructure that allows movement of an application online between different architectures
D. A management solution that provides support across multiple x86 hypervisors.
正解:B
質問 4:
A customer is looking for a solution that delivers a workload management across the platforms that run his core application. Additionally he is interested in a continuous availability solution that controls all components of the application independent of the platform that is used for the deployment. Which of the following makes zEnterprise the best match to those requirements?
A. z/OS offers with Parallel Sysplex and WLM a best of breed solution. For the distributed part Tivoli System Automation for Multi Platforms (TSAMP) delivers the required functionality.
B. The customer can consolidate all application parts either on z/OS or on Linux on System z to meet the requirements.
C. The combination of Unified Resource Manager, GDPS and TSAMP meets all requirements without changes to the applications.
D. The new Infiniband coupling link of z196 offer the opportunity to interconnect all platforms. The Unified Resource Manager delivers a central tool to control all events.
正解:C
質問 5:
A zEnterprise customer is considering consolidating multiple CPCs. What basic technical factors should be included when performing a CEC consolidation analysis?
A. Involve customer application and datacenter managers on their views about personnel relocation.
B. Integrate all SCP LPAR definitions and CEC weights, then consider possible elimination or integration options.
C. Discuss implications of IPv6 on capacity requirements
D. Ask if SOA is included in Application Development methodology futures.
正解:B
質問 6:
The Solution edition for Data Warehousing includes which of the following components?
A. A pre-defined hardware configuration of 2 general processors and 2 zIIPs with 16 GB of memory for LPAR definition
B. DB2 for Linux on System z with partitioning feature
C. Foundational z/OS and DB2 for z/OS software to deploy a warehousing database on z/OS
D. Information Management software and OPTIM Data Privacy Solution
正解:C