A customer has a Power with AIX server farm with network connectivity to a zEnterprise processor. Which of the following would represent a potential zBX opportunity for this customer?
A. The customer wants a stand-alone zBX with Power blades to free up floor space.
B. The customer wants to move Linux virtual machines from the zEnterprise to a zBX so that the Linux applications can be closer to a Smart
C. The customer wants to accelerate certain DB2 on zEnterprise queries.
D. The customer wants to accelerate their DB2 on Power with AIX.
正解:C
質問 2:
A customer recently ordered a z196 with a zBX. Which of the following is the best action a specialist could take to ensure the customer is satisfied with the new zBX?
A. Conduct and "Fit for Purpose Study"
B. Mentor the customer on installing PowerVM and VMware
C. Conduct a z/VM Implementation Workshop
D. Review the hardware support process and the HMC documentation for the z196 CPC and the zBX
正解:D
質問 3:
A customer is considering a z196 with a zBX. Which of the following is the best action a specialist could take to ensure customer satisfaction?
A. Conduct a "Fit for Purpose Study"
B. Mentor the customer on installing PowerVM and VMware
C. Conduct a z/VM Implementation Workshop
D. Review the hardware support process and the HMC documentation for the z196 CPC and the zBX
正解:A
質問 4:
A System z customer has a new CIO. The CIO is concerned about continuous operations and recovery following a site catastrophe. Which of the following addresses this issue?
A. Parallel Sysplex
B. CBU
C. DR
D. GDPS
正解:D
質問 5:
The zEnterprise Technical Specialist is talking with the customer support group. The customer technical staff has made several statements regarding their individual understanding of the cabling for zBX racks. Which of the following customer statements is incorrect?
A. All cables required to implement and connect a zBX to the customer environment (LAN, SAN) must be ordered separately
B. In order to connect a zBX correctly to a customer network detailed planning is necessary the evaluate the requirements (SFPs, cables)
C. All cables required to connect a zBX to a node are delivered by default.
D. All cables required to implement and connect a zBX to the customer environment (LAN,SAN) are delivered by default.
正解:A
質問 6:
A customer is looking for a solution that delivers a workload management across the platforms that run his core application. Additionally he is interested in a continuous availability solution that controls all components of the application independent of the platform that is used for the deployment. Which of the following makes zEnterprise the best match to those requirements?
A. z/OS offers with Parallel Sysplex and WLM a best of breed solution. For the distributed part Tivoli System Automation for Multi Platforms (TSAMP) delivers the required functionality.
B. The customer can consolidate all application parts either on z/OS or on Linux on System z to meet the requirements.
C. The combination of Unified Resource Manager, GDPS and TSAMP meets all requirements without changes to the applications.
D. The new Infiniband coupling link of z196 offer the opportunity to interconnect all platforms. The Unified Resource Manager delivers a central tool to control all events.
正解:C