A customer looking for an all-flash solution is evaluating IBM products The primary concern for the customer is the rapid growth of its database environment.
Which IBM flash solution should the specialist recommend to control capacity utilization?
A. IBM FlashSystem A9000
B. IBM DS8886 PFE
C. IBM FlashSystem 900
D. IBM XIV Gen3 with SSD
正解:C
質問 2:
A customer has a requirement for 250,000 IOPS and 200TB of capacity. The customer requires an enterprise-level maintenance agreement for the storage solution.
Which solution should the technical specialist recommend to the customer?
A. FlashSystem V840 with Storwize V3700 and eight drawers of 1.2TB drives
B. XIV with 3TB drives and SSD cache
C. DS8870 with ranks of 1.2TB drives and HPFE
D. Storwize V7000 with eight drawers of 1.2TB drives and 12 800GB SSDs
正解:C
質問 3:
Which statement correctly applies to RPO and Copy Data Services?
A. RPO is the minimum time interval that a mirrored volume or consistency group can lag behind the source volume.
B. RPO is a pre-defined parameter based on the type of replication selected.
C. Volumes backed up from clones do not affect RPO.
D. Multiple consistency groups can be supported with asynchronous mirroring for different RPOs.
正解:D
質問 4:
What is the most complete source of information for power, cooling, and floor space requirements for IBM tape products?
A. Tape Magic
B. Installation and Planning Guide
C. Capacity Magic
D. Product announcement letters
正解:B
質問 5:
A customer plans to upgrade its LTO-4 tapes and drives to LTO-7 drives.
Which solution should the technical specialist propose to the customer concerning existing media that needs to be retained for later recovery?
A. Use the LTO-4 drive to write to the new LTO-7 media.
B. Keep an existing drive to process existing LTO-4 media.
C. Existing media can be read using LTO-7 drives.
D. Existing media can be reformatted by LTO-7 drives.
正解:B
質問 6:
How is RTO defined?
A. The amount of time it takes, from initial disaster declaration, to having critical business processes available to users
B. The time it takes to restore the backup tapes at a remote site
C. The amount of data loss that's deemed acceptable, defined by application, in the event of a disaster-failover scenario
D. The time it takes to complete the nightly backup process
正解:A
質問 7:
What is the function of Copy Export within an IBM TS7760?
A. Exports data to be read by third-party tape drives
B. Copies data between grid connected IBM TS7760s
C. Creates copies of data on tape for disaster recovery
D. Moves data out of cache to provide more space
正解:C
質問 8:
A customer has requested an IBM Spectrum Virtualize solution with capability to make it easy for users to create relevant and meaningful custom reports.
What should the solution architect propose to satisfy this requirement?
A. Svcmon with daily data collection
B. Native IBM Spectrum Virtualize performance tool(s)
C. IBM Spectrum Control
D. Excel macros linked to storage API
正解:C
菊地** -
このC1000-022問題集は使いこなせるのであれば私が一番おすすめする問題集になりました。無事試験に合格することができました。