During the processing of production orders planned and actual costs are determined.
On which of the following objects can you collect these costs? (Choose two)
A. Product cost collector
B. Work center
C. Planned order
D. Production order
正解:A,D
質問 2:
Which Customizing element controls the determination of planned costs in production orders?
A. Settlement profile
B. Calculation procedure
C. Accounting type
D. Costing variant
正解:D
質問 3:
Which of the following statements regarding lot size procedures is correct?
A. If a long-term lot size is used, procurement is conducted with a long-term perspective.
B. The procurement quantity of a lot size procedure can be specified using a safety time period profile.
C. The lot size quantity can be influenced using a minimum lot size and the rounding profile.
D. If a make-to-order production strategy is used, only the lot-for-lot (exact) lot size can be applied.
正解:C
質問 4:
Which of the following elements can be used in a process order? (Choose three)
A. Relationships
B. Parallel sequences
C. Process instructions
D. Phases
E. Suboperations
正解:A,C,D
質問 5:
For which of the following objects can you enter a confirmation? (Choose two)
A. Trigger Point
B. Work Center
C. Production order operation
D. Production order
正解:C,D
質問 6:
When maintaining a work center, formulas can be assigned in the scheduling view. Formulas use formula parameters for calculation.
What can be the origin of the formula parameters used for scheduling? (Choose three)
A. Standard values in the operations of routings
B. General item values of bill of materials
C. General values from work scheduling view of the material master
D. User-defined fields in the operation of routings
E. General operation values of routings
正解:A,D,E
質問 7:
You use a planning time fence and fixing type 1. You receive a customer order with a material availability date within the planning time fence.
What do you have to consider in this scenario?
A. Planned orders are created within the planning time fence and automatically firmed by requirements planning.
B. Planned orders that are created by requirements planning are shifted to the end of the planning time fence.
C. Requirements planning considers only changes that are relevant for scheduling within the planning time fence.
D. The MRP controller cannot create planned orders within the planning time fence.
正解:B
質問 8:
You want to send production order-related data like confirmations, goods receipts, goods issues, and other user-specific actual data from an external process control system to SAP ECC.
How can you fulfill this requirement?
A. Use the service application interface (SAPI).
B. Use the core interface (CIF).
C. Use the PP-PDC interface.
D. Use the PI-PCS interface.
正解:D
1032 お客様のコメント





贵村** -
PCでもスマホでも出来るようなので、電車などの隙間時間もデスクでも、効率よくC_TSCM42_65学習できそうです。