Which of the following requirements can be classified as functional requirements? (Choose 3)
A. Authentication.
B. Maintainability.
C. Reporting.
D. Administration.
E. Availability.
正解:B,C,D
質問 2:
Which is the out-of-the-box integration touch point available with SAP Hybris Cloud for Customer?
A. Real time synchronization of address data.
B. Asynchronous synchronization of product data.
C. Res' time synchronization of customer data.
D. Asynchronous synchronization of customer data.
正解:D
質問 3:
Which checkout scenarios are supported out of the box in the SAP Hybris B2C accelerator? (Choose 2)
A. Guest checkout.
B. One-click checkout.
C. Quick checkout.
D. Express checkout.
正解:A,D
質問 4:
Your customer tells you that an order is either:
- placed
- pending
- in delivery OR
- fulfilled
What UML diagram do you use to model the lifecycle of an order for this customer?
A. Data flow diagram.
B. Use case diagram.
C. Class diagram.
D. State diagram.
正解:D
質問 5:
You are creating a new product catalog. Product data and product images are loaded from two different external sources. Which strategies could you use to set up the product catalog versioning system in SAP Hybris Commerce? (Choose 2)
A. Load each data source into a content catalog version, then synchronize the content catalog version with '-' a product catalog version.
B. Load each data source into separate online product catalog versions of the same catalog.
C. Load each data source into separate staged product catalog versions, then synchronize both staged
'-' product catalog versions with a single online product catalog version.
D. Load both data sources into a single, staged product catalog version, then synchronize the staged catalog '-' version with the online product catalog version.
正解:C,D
質問 6:
Which tasks does a business analyst perform during the Foundation phase? (Choose 3)
A. Define requirements.
B. Document requirements.
C. Assign key tasks.
D. Prioritize requirements.
E. Create requirements.
正解:A,B,D
質問 7:
What is Application Management according to the SAP Hybris Application Lifecycle Framework for Commerce? (Choose 2)
A. A continuous work stream aimed to support, operate, and maintain the live solution once it's been '-
' deployed to a live production environment and is being used by end users.
B. A continuous work stream running the entire duration of a release, aiming to organize preparation and '-' execution activities around a go-live event.
C. A continuous work stream that starts with the first deployment to production environment, aiming to
'-' provide support and live-operations management.
D. A continuous work stream that starts with the first initiation phase, aiming to provide ongoing smaller
'-' development work that can be done outside of a Project.
正解:A,C
質問 8:
In which project phase do you make a go/no-go decision for the Build phase?
A. Deployment.
B. Engineering.
C. Documentation.
D. Foundation.
正解:D
Asaka -
今後、引き続く参考書を利用します。Pass4Test様がかなり実力をつけてくださったおかげだと思います。心から感謝します。