Ticket machines are to be installed at the train station of a major European airport to enable newly arriving passengers to quickly purchase their tram tickets.
You are testing this new application and the following Use Case has been provided:
USE CASE: Credit Card Purchase
* Use Case ID: UC-001401
* Purpose: To purchase a single ticket to the city center
* Actors: User
* Preconditions: Ticket machine is at the "select language" screen, user has a valid credit card

You have been asked to review this Use Case. Which ONE of the following checklist items are TRUE and will pass?
SELECT ONE OPTION:
A. The main path is clearly defined
B. All error messages are defined
C. All alternate paths are identified
D. Each path is testable
正解:A
解説: (Pass4Test メンバーにのみ表示されます)
質問 2:
You are running a regression test suite using a keyword-driven test approach for automation. The test suite has been enhanced for the current release to include:
* Three new test cases covering new business functionality
* Several new keywords, as project schedule constraints mean that more effective maintenance of the automated test cases is required However, the automated suite failed unexpectedly when executing one of the new test cases, which was also utilizing a new keyword.
As Test Analyst, what should be your first step?
SELECT ONE OPTION:
A. Examine the sequence of tests that led up to the failure to determine if the problem occurred in a previous step
B. Ask the technical test analyst to review the keyword script(s), as this is a new keyword and is the most likely cause of failure
C. Run the test case manually to see if the failure lies in the System Under Test (SUT). If the test failsmanually, raise a defect report
D. Remove the test case from the regression suite and convert it to a manual test, to reduce further impact on project schedules
正解:B
解説: (Pass4Test メンバーにのみ表示されます)
質問 3:
When applying the State Transition test technique to the given State Transition diagram, and assuming that screen refreshes can be applied multiple times, how many 1-switch transitions are there starting from the state 'Screen 1'?

SELECT ONE OPTION
A. 5
B. 3
C. 10
D. 7
正解:A
解説: (Pass4Test メンバーにのみ表示されます)
質問 4:
Which of the following statements about defect-based techniques is TRUE?
SELECT ONE OPTION
A. In defect-based testing, the type of defect sought is used as the basis for test design
B. Defect-based testing is a technique that identifies defects in requirements early in the lifecycle
C. The coverage criteria for black-box test techniques tend to be less systematic than for defect-based test techniques
D. Defect-based techniques are mainly used by developers at the component test level
正解:A
解説: (Pass4Test メンバーにのみ表示されます)
質問 5:
A software component for a game application calculates a player's trophy level based on two input parameter values: Points Earned and Level of Difficulty. A total score is calculated by the component as:
Total Score = Points Earned × Level of Difficulty
The trophy levels are:
* Blue- total score equal to or less than 40
* Silver- total score > 40
* Gold- total score > 70
* Diamond- total score > 80
* Platinum- total score > 90
The component then outputs the correct trophy level.
Applying theEquivalence Partition test design techniqueto this component, what percentage of output partitions have been exercised by the following suite of test cases?
* Player 1 - Points earned 25, level of difficulty 2
* Player 2 - Points earned 20, level of difficulty 3
* Player 3 - Points earned 30, level of difficulty 1
SELECT ONE OPTION:
A. 10%
B. 60%
C. 40%
正解:C
解説: (Pass4Test メンバーにのみ表示されます)
武藤** -
ISTQB-CTAL-TA情報量は多いのでそれに関しては満足。Pass4Testさんの問題集試験対策には本当に信頼している。