According to ANSI ASQ Z1.4. switching from tightened inspection to normal inspection can occur when how many consecutive lots have been accepted?
A. Nine out of ten
B. Five out of five
C. Eight out of ten
D. Four out of five
正解:B
解説: (Pass4Test メンバーにのみ表示されます)
質問 2:
The pre-production or pre-service planning process should include which of the following activities?
A. Development of cost of quality parameters
B. Preparation of product and process control plans
C. Certification of suppliers
D. Implementation of process quality audits
正解:B
解説: (Pass4Test メンバーにのみ表示されます)
質問 3:
Which of the following statements is true about control charts?
Calculator
A. They provide a common language for discussing process performance.
B. They enable production to use process improvements to reduce unit costs.
C. They are used to identify which products to inspect.
D. They are used to identify the root cause of process problems.
正解:A
解説: (Pass4Test メンバーにのみ表示されます)
質問 4:
A system to capture product revisions that must be tracked is more commonly known as
A. procedure control
B. batch control
C. change control
D. work instruction control
正解:C
解説: (Pass4Test メンバーにのみ表示されます)
質問 5:
An auditor who finds a major discrepancy during a pre-award audit of a new supplier should take which of the following actions?
A. Investigate the cause of the discrepancy
B. Include the discrepancy in the final report
C. Issue a stop-work request
D. Verify prompt corrective action
正解:B
解説: (Pass4Test メンバーにのみ表示されます)
質問 6:
Which of the following criteria must be considered when a classification of defects system is established?
A. The current cost of quality system
B. Tightness of tolerance as an indication of failure
C. The financial impact of the defects
D. The relative seriousness of the defects
正解:D
解説: (Pass4Test メンバーにのみ表示されます)
質問 7:
The primary benefit of implementing a supplier rating system for an organization is to
A. guarantee an improvement in the supplier audit
B. help the organization identify supplier's areas competencies and weaknesses
C. ensure reduction in the supplier's process variability
D. measure the supplier's timeliness and delivery
正解:B
解説: (Pass4Test メンバーにのみ表示されます)
質問 8:
A company is developing a machine that has many modules. Each module works as intended, but when placed in the machine the system performs at less than desired levels. System changes have further optimized each module, but overall system optimization has continued to decline. This is an example of
A. a feasibility study
B. an unintended consequence
C. a PEST analysis
D. a SWOT analysis
正解:B
解説: (Pass4Test メンバーにのみ表示されます)
質問 9:
Which of the following statements is true about the average outgoing quality limit (AOQL)?
A. It is the replacement measure for the acceptance quality limit (AQL).
B. It cannot be used to define the Dodge-Romig defect acceptance number.
C. It assumes screening and replacement of nonconforming units.
D. It can be used instead of ANSI ASQ Z1.4 single sampling plans.
正解:C
解説: (Pass4Test メンバーにのみ表示されます)