A customer wants to replace a POWER5 server with a POWER7+ system. The customer would like to re-use the SCSI attached TS3100 tape library.
What needs to be done to make this possible?
A. The TS3100 needs to be upgraded to a TS3200.
B. The SCSI adapter needs to be migrated to the POWER7+ CEC.
C. An expansion drawer needs to be purchased to connect to the TS3100.
D. The tape drives in the TS3100 library need to be converted from SCSI to SAS.
正解:D
質問 2:
A customer will be upgrading to a new POWER7+ server running IBM i 7.1. This customer is currently running IBM i 6.1 and uses AnyNet for SNA connectivity over TCP/IP. What must be configured to allow this customer to continue to receive IBM support for problems which may occur with the TCP/IP-based SNA connectivity?
A. EtherChannel
B. Converged Network Adapters
C. Virtual IP Addressing (VIPA)
D. Enterprise Extender
正解:D
質問 3:
A customer wants to use a virtual tape library instead of a TS3500 in BRMS. What needs to be considered?
A. Using a virtual tape library is not necessarily faster than physical tape back-up.
B. Only one virtual tape library drive can be used at a time.
C. All BRMS physical media pools must be duplicated to virtual tape library media pools
D. Virtual tape library requires a smart 10
正解:A
質問 4:
Which of the following is a benefit of redundant cache on a SAS disk adapter?
A. Improved performance
B. Hot-spare protection
C. Multipath support
D. Disk level mirroring
正解:A
質問 5:
When could an IVM instance be preferable to an HMC for systems management?
A. Where Power Compute Nodes are deployed in a PureFlex environment
B. When a single, entry-level Power Systems server needs to be split into client LPARs
C. When Systems Director is used for centralized management
D. Where multiple partition profiles are required
正解:B
質問 6:
A customer wants to replace their single-partition POWER5 system with a POWER7 system that will run 2 IBM i partitions. What is needed in order to transfer the IBM Licensed Program Products?
A. The license key of the license program from the POWER5 system
B. A software maintenance contract for the POWER7 system
C. A proof of entitlement
D. The original POWER5 system invoice
正解:C
質問 7:
A customer running IBM i VSR4MO on a POWERS 520 is considering purchasing a POWER7+720. What steps should be performed as part of the upgrade/migration process?
A. Run ANZOBJCVN on their current V5R4M0 system to identity potential program issues.
B. Upgrade to 6.1 Run ANZOBJCVN to determine if the customer can upgrade to IBM i 7.1
C. Upgrade the current machine to 6.1
Run ANZOBJCVN
Then upgrade to 7.1 to support the new hardware
D. Upgrade to V5R4M5
Run STROBJC VN to prepare programs for 7.1.
正解:A
市宫** -
Pass4Testさんのアプリバージョンの模擬試験を繰り返し行うことで、模擬試験に慣れることができるので、本試験で緊張したり焦らず、冷静に落ち着いて試験に臨むことができました。無事にC4040-226の試験に受かりました。