A process simula-tion completed with the message "simula-tion finished but not all tasks were completed successfully." Process case summary showed that all cases completed successfully. When simulating with half the number of tokens, the simula-tion completed successfully. What should be done to complete simula-tion on all the tokens?
A. Change the token "Time trigger" to an earlier time and date.
B. Increase the number of days for "Delay for steady state simula-tion".
C. Change the setting "Process availability ends" to a later date.
D. Increase the number of days for "Maximum simula-tion duration".
正解:C
質問 2:
Which of the following business processes are candidates for modeling for compensation?
A. Processing an exception, resolving the database error and terminating the process instance.
B. Cancelling a flight reservation, refunding purchase price and releasing seats.
C. Calculating a correlation key, updating the business item and restarting the process based on the key.
D. Determining current inventory, ordering new inventory and stocking the new inventory.
正解:B
質問 3:
Which set of activities does the IBM WebSphere Business Modeler support in the BPM Enabled by SOA methodology?
A. Tracking of real-time and historical process performance times through monitoring Key Performance Indicators (KPIs).
B. Developing, assembling and testing of an integration solution.
C. Gathering business requirements, designing, simulating, and optimizing desired business processes.
D. Executing the model and policies to realize business intent.
正解:C
質問 4:
A process analyst needs to conduct a meeting with a subject matter expert to review the user interface forms for a specific path in a process. Which feature in business designer should the process analyst use?
A. Process capability
B. Process advisor
C. Process storyboard
D. Process walkthrough
正解:D
質問 5:
A business analyst needs to validate external process touch points using Business Designer. Which of the following will be useful in the validation?
A. Business vocabularies
B. Process walkthrough
C. Process collaborations
D. Process Advisor
E. Process maps
正解:C,E
質問 6:
Refer to the Exhibit.

The process analyst needs to simulate the process with the following business attributes: Total number of customer information business item received for the process = 100 Business items arrived at a rate of 1 per minute. How should the inputs business items be modeled in the simulation profile?
A. Set in the Profile Attribute - Input Tab the following:
-Total number of tokens = 100
-
Time trigger: Time between bundle = 1 minute
B. Start with the process input instead of the start node. Set in the Profile Attribute - Input Tab the following:
-Number of tokens per bundle = 100
-Time trigger: Time between bundle = 1 minute
C. Set in the Profile Attribute - Input Tab the following:
-Number of tokens per bundle = 100
-
Time trigger: Time between bundle = 1 minute
D. Start from the process input instead of the start node. Set in the Profile Attribute - Input Tab the following:
-Total number of tokens = 100
-
Time trigger: Time between bundle = 1 minute
正解:D