最新なIBM C9550-606問題集(110題)、真実試験の問題を全部にカバー!

Pass4Testは斬新なIBM WebSphere C9550-606問題集を提供し、それをダウンロードしてから、C9550-606試験をいつ受けても100%に合格できる!一回に不合格すれば全額に返金!

  • 試験コード:C9550-606
  • 試験名称:IBM WebSphere Business Modeler Advanced Edition V7.0, Business Analysis and Design
  • 問題数:110 問題と回答
  • 最近更新時間:2025-04-28
  • PDF版 Demo
  • PC ソフト版 Demo
  • オンライン版 Demo
  • 価格:12900.00 5999.00  
質問 1:
A new payment process will be used to process transfer requests in the US and Europe where: 1) payments should be processed on the same day of request Monday to Friday. 2) the number of European and US requests is similar per day during normal working hours. Which option illustrates the input simu lation setting that will help analyze this process?
A. Set a timetable trigger to receive requests assigning a custom timetable specifying different periods for the US and Europe.
B. Set a time trigger to receive requests using a distribution with a general timetable for the US and Europe.
C. Set a time trigger to receive requests assigning as start time a general timetable valid for the US and Europe.
D. Set a timetable trigger to receive requests assigning a general timetable valid for the US and Europe.
正解:A

質問 2:
A process analyst needs to model and simulate the following scenario in a business process: In a call center the manager of the department starts to take calls after all the operators are on the phone. How should the scenario be modeled to represent this behavior?
A. Create operator and manager roles and then allocate them to the Take Call activity. Then simulate the process.
B. Create an operator role and manager individual resource and then allocate them to the Take Call activity. Then simulate the process.
C. Create operator and manager roles and additional business logic in the model to accomplish this scenario. Then simulate the process.
D. Create operator and manager resources and then allocate them to the Take Call activity. Then simulate the process.
正解:C

質問 3:
A task has three different individual resource requirements. Each resource has a different length of time required. When simulating with the option to use resources' time required as a task processing time, what is the time required for the task to complete?
A. The sum of all the resource time required.
B. The same as the resource with the shortest time required.
C. The duration set for the task processing time.
D. The same as the resource with the longest time required.
正解:D

質問 4:
Which of the following differentiates Business Process Management (BPM) from other traditional functional management disciplines?
A. Traditional functional management disciplines use cross-functional approaches to drive bottom line results.
B. BPM uses a one-time approach to process improvement to drive the bottom line results.
C. BPM uses cross-functional approaches to drive bottom line results.
D. Traditional functional management disciplines use continuous improvement approaches to drive results.
正解:C

質問 5:
A bank is launching a new service directed to the new buyers' market where a customer can buy a house and request a loan from them in the same transaction. A process analyst needs to model:
1. how both processes are linked together, and 2. based on the loan grant status, whether the
buying process completes or stops abruptly. Which of the following illustrates how the process
analyst should model these requirements?
A. Use a global process to model how the loan process is called from the purchase process and
define a Notification receiver in the purchase process.
B. Use a global process to model how the loan process is called from the purchase process and
define a Notification receiver in the loan process.
C. Use a Notification broadcaster to notify the purchase process of the loan status and a
Notification receiver to model how the data is received.
Define the process scope in the Notification receiver.
D. Use a Notification broadcaster to notify the purchase process of the loan status and a
Notification receiver to model how the data is received.
Define the process scope in the Notification broadcaster.
正解:D

質問 6:
A process analyst has completed a future state process model and needs to validate it against process improvement requirements. The future state process must be able to handle 25% more throughput than the current state, while maintaining or improving process duration. Presently, the business process handles 2000 requests daily. Using dynamic analysis, how can the process analyst validate whether the future state process will satisfy these requirements?
A. 1. Simulate the future state process model at 2000 requests per day.
2.Simulate the future state process model at 2500 requests per day.
3.Generate a Processes Duration Comparison report upon the results of the future state process model to verify the Average Elapsed Duration.
B. 1. Simulate the current state process model at 2500 requests per day.
2.Simulate the future state process model at 2500 requests per day.
3.Generate a Processes Duration Comparison report to verify the Average Elapsed Duration of the future state process model reflects a favorable percentage change over the current state process model.
C. 1. Simulate the current state process model at 2000 requests per day.
2.Simulate the future state process model at 2500 requests per day.
3.Generate a Processes Duration Comparison report to verify the Average Elapsed Duration of the future state process model reflects a favorable percentage change over the current state process model.
D. 1. Simulate the current state process model at 2000 requests per day.
2.Simulate the future state process model at 2000 requests per day.
3.Generate a Processes Duration Comparison report to verify the Average Elapsed Duration of the future state process model reflects a favorable percentage change over the current state process model.
正解:C

質問 7:
Which set of activities does the IBM WebSphere Business Modeler support in the BPM Enabled by SOA methodology?
A. Tracking of real-time and historical process performance times through monitoring Key Performance Indicators (KPIs).
B. Developing, assembling and testing of an integration solution.
C. Gathering business requirements, designing, simulating, and optimizing desired business processes.
D. Executing the model and policies to realize business intent.
正解:C

質問 8:
A process analyst has completed a process model and is ready to validate it. One of the validations is to ensure that there are enough bulk resources defined within the project to meet the process resource allocation requirements. Using Static Analysis, how can the process analyst quickly validate that all activities in the process have sufficient bulk resources defined?
A. 1. Run a Resource Availability Report.
2. Verify within the results that all bulk resources show allocation by having a duration to indication availability.
B. 1. Run a Paths Unable to Be Followed Report.
2.For each activity that can not start, identify the associated bulk resources.
3.Ensure that the bulk resources required do not exceed the available number defined.
C. 1. Run an Activities Unable to Start Report.
2. For each activity that cannot start, identify the reasons that indicate the quantity of required bulk resources are not available.
D. 1. Run a Qualified Resources for Role Report.
2. Verify within the results if any roles do not have any bulk resources with the necessary role qualifications to be allocated.
E. 1. Run an Activity Resource and Role Leveling Report.
2.Verify within the results that the quantity of each bulk resource allocated to an activity does not exceed the bulk resource's availability value.
3.Ensure that the Allocated resource value does not exceed the Available resource value for each activity.
正解:C,E

質問 9:
Refer to Exhibit.

A process analyst has performed simula-tion upon a business process and is analyzing the resource allocation within the process. After running the Process Resource Allocation Dynamic Analysis Report, it is observed that there is significant Average Shortage Duration on the "Wash Car" task within the process for both allocated bulk resources. The process analyst observes that the Water bulk resource has been defined as "Consumable" and has a sufficient Available Quantity value defined in order to support simula-tion input token generation. However, other tasks within this process also consume water. The Washer bulk resource is not allocated for any other activity in the process Based on this information, what conclusions can the process analyst draw in regards to reducing the average resource shortage durations?
A. There is no Average Shortage Duration for the Water bulk resource. The resource shortage occurs because of unavailable Washers, and this shortage duration is also reflected for the Water bulk resource as the task waits for all resources to become available before starting. Increasing the number of available Washer resources will reduce the Average Shortage Duration reflected for both Washers and Water.
B. Water is a consumable resource and therefore can not be reused. Once no more units of Water are available to a process simula-tion, the lack of availability is reflected in the Average Shortage Duration. Increasing the available units for both the Water and Washer resources will reduce the Average Shortage Durations for the task.
C. Water is a consumable resource and therefore can not be reused. Uncheck the Water bulk resource's Consumable option to make it reusable. Now, other tasks within the process can reuse the Water resource and will not have to wait to allocate it. Therefore, the Average Shortage Duration will decrease for the Water bulk resource.
D. Water is a consumable resource and therefore can be reused. Because of this, other tasks that are using the Water units are preventing the Wash Car activity from allocating units of Water to perform the task. This lack of availability is reflected in the Average Shortage Duration. Increasing the available units for the Water resource will reduce the Average Shortage Duration for the task.
正解:A

弊社は無料でWebSphere試験のDEMOを提供します。

Pass4Testの試験問題集はPDF版とソフト版があります。PDF版のC9550-606問題集は印刷されることができ、ソフト版のC9550-606問題集はどのパソコンでも使われることもできます。両方の問題集のデモを無料で提供し、ご購入の前に問題集をよく理解することができます。

簡単で便利な購入方法ご購入を完了するためにわずか2つのステップが必要です。弊社は最速のスピードでお客様のメールボックスに製品をお送りします。あなたはただ電子メールの添付ファイルをダウンロードする必要があります。

領収書について:社名入りの領収書が必要な場合には、メールで社名に記入して頂き送信してください。弊社はPDF版の領収書を提供いたします。

IBM C9550-606 認定試験の出題範囲:

トピック出題範囲
トピック 1
  • Business Process Simulation Analysis and Validation
トピック 2
  • Business Process Modeling Concepts
トピック 3
  • Business Process Management Concepts and Business Process Modeling Methodologies and Frameworks

参照:http://www-03.ibm.com/certify/tests/ovrC9550-606.shtml

一年間無料で問題集をアップデートするサービスを提供します。

弊社の商品をご購入になったことがあるお客様に一年間の無料更新サービスを提供いたします。弊社は毎日問題集が更新されたかどうかを確認しますから、もし更新されたら、弊社は直ちに最新版のC9550-606問題集をお客様のメールアドレスに送信いたします。ですから、試験に関連する情報が変わったら、あなたがすぐに知ることができます。弊社はお客様がいつでも最新版のIBM C9550-606学習教材を持っていることを保証します。

弊社のC9550-606問題集のメリット

Pass4Testの人気IT認定試験問題集は的中率が高くて、100%試験に合格できるように作成されたものです。Pass4Testの問題集はIT専門家が長年の経験を活かして最新のシラバスに従って研究し出した学習教材です。弊社のC9550-606問題集は100%の正確率を持っています。弊社のC9550-606問題集は多肢選択問題、単一選択問題、ドラッグ とドロップ問題及び穴埋め問題のいくつかの種類を提供しております。

Pass4Testは効率が良い受験法を教えてさしあげます。弊社のC9550-606問題集は精確に実際試験の範囲を絞ります。弊社のC9550-606問題集を利用すると、試験の準備をするときに時間をたくさん節約することができます。弊社の問題集によって、あなたは試験に関連する専門知識をよく習得し、自分の能力を高めることができます。それだけでなく、弊社のC9550-606問題集はあなたがC9550-606認定試験に一発合格できることを保証いたします。

行き届いたサービス、お客様の立場からの思いやり、高品質の学習教材を提供するのは弊社の目標です。 お客様がご購入の前に、無料で弊社のC9550-606試験「IBM WebSphere Business Modeler Advanced Edition V7.0, Business Analysis and Design」のサンプルをダウンロードして試用することができます。PDF版とソフト版の両方がありますから、あなたに最大の便利を捧げます。それに、C9550-606試験問題は最新の試験情報に基づいて定期的にアップデートされています。

弊社のWebSphere問題集を利用すれば必ず試験に合格できます。

Pass4TestのIBM C9550-606問題集はIT認定試験に関連する豊富な経験を持っているIT専門家によって研究された最新バージョンの試験参考書です。IBM C9550-606問題集は最新のIBM C9550-606試験内容を含んでいてヒット率がとても高いです。Pass4TestのIBM C9550-606問題集を真剣に勉強する限り、簡単に試験に合格することができます。弊社の問題集は100%の合格率を持っています。これは数え切れない受験者の皆さんに証明されたことです。100%一発合格!失敗一回なら、全額返金を約束します!

804 お客様のコメント最新のコメント

松本** - 

要点がまとめてあって結果良かったです!無駄なく効率よく短時間で合格レベルに到達することができる,C9550-606受験者必携の1冊ってじっかんしました

枪田** - 

余裕でC9550-606に受かりました!!
C9550-606試験に受かることだけの目的としても最適だね。

武市** - 

知識は勉強してからチャレンジもあります。
いちばんやさしいITパスポートで学習してからがちょうどくらいだと思います。

Kouda - 

これは初めてC9550-606試験を受験しました。合格できるかどうかに非常に心配しています。IBMに助かりまして、本当にありがとうございました。いい点数で試験に合格しました。的中率が本当に高いでございます、再び感謝の意を表します。

森由** - 

C9550-606試験参考書は有効的な資料です。10日間の準備の後、C9550-606試験に合格しました。 私はとても感謝しています!

浜口** - 

試験を受けないまでも、C9550-606情報システムに関連した仕事をする前に一通り目を通しておくといろいろ参考になると思います。

井上** - 

ソフトとアプリがもらえて、内容も濃く、問題や擬似問題集と回答などもあり、C9550-6061冊で試験に対応できる良い本だと思います。

小出** - 

出題分野を体系的に幅広く網羅し、側注付きでC9550-606理解しやすい参考書だ。

Matsuda - 

今日C9550-606の受験結果が出ました。高得点で合格になりました。有難いPass4Test本当に内容もすごく素晴らしかった。

Aizawa - 

C9550-606の問題集、読みやすく わかりやすい解説が付き、これで受かる気がしたっと思って受験して本当に受かりました。すごい。

Oda - 

各項の注目点と基本的な考え方が分かりやすい内容だ。Pass4Testお世話になりました。

汤山** - 

先週C9550-606認定資格を取得しました。Pass4Test様がかなり実力をつけてくださったおかげだと思います。心から感謝します。幸い試験に合格しました。本当に助けになりました。

河野** - 

C9550-606問題集を購入し、1週間ぐらい勉強して受かりました。楽勝です。
サポートしてくれてありがとうございました!

Hoshino - 

C9550-606模試が2回分あるためほとんどの出題範囲をカバーしている 解説も丁寧に記載してある。合格だ。役に立ちました。Pass4Testさんこれからもお世話になります。ありがたい

メッセージを送る

あなたのメールアドレスは公開されません。必要な部分に * が付きます。

Pass4Test問題集を選ぶ理由は何でしょうか?

品質保証

Pass4Testは試験内容に応じて作り上げられて、正確に試験の内容を捉え、最新の97%のカバー率の問題集を提供することができます。

一年間の無料アップデート

Pass4Testは一年間で無料更新サービスを提供することができ、認定試験の合格に大変役に立ちます。もし試験内容が変われば、早速お客様にお知らせします。そして、もし更新版がれば、お客様にお送りいたします。

全額返金

お客様に試験資料を提供してあげ、勉強時間は短くても、合格できることを保証いたします。不合格になる場合は、全額返金することを保証いたします。

ご購入の前の試用

Pass4Testは無料でサンプルを提供することができます。無料サンプルのご利用によってで、もっと自信を持って認定試験に合格することができます。