You set up the process for Inspection Rounds, so that the technician can enter measurement readings in a simplified way using the overall t me confirmation.
What must you do before you set up a general maintenance task list?
There are 2 correct answers to this question.
Response:
A. Assign a measuring point as a PRT to a Task List Operation.
B. Assign a measuring point as inspect on point to the Task List Header.
C. Assign a piece of equipment with allocated measuring point to a Task List Operation
D. Create a piece of PRT equipment and allocate it using the PRT overview button.
正解:A,C
質問 2:
What must you do before the system can generate entries in the action log of an equipment?
Please choose the correct answer.
Response:
A. Set the corresponding flag when you maintain the equipment category
B. Assign a user status profile to the equipment category.
C. Define an additional business view for equipment category.
D. Maintain the setting for the usage history update.
正解:A
質問 3:
What is the consequence when you activate alternative labelling?
Please choose the correct answer.
Response:
A. The labelling system must be assigned to the functional location category.
B. You can change the primary functional location label and keep the old label as a historical label.
C. You CANNOT deactivate an alternative labelling.
D. You can change a primary functional location label and delete the old functional location label
正解:B
質問 4:
Which parameters are calculated during scheduling of a performance-based maintenance plan?
There are 2 correct answers to this question.
Response:
A. Planned date based on sum of counter readings
B. Monthly performance based on annual estimate
C. Daily performance based on annual estimate
D. Planned date based on cycle and daily performance
正解:A,D
質問 5:
Which valuation category do you use to refurbish the material?
Please choose the correct answer.
Response:
A. In house/External Procurement
B. Retail
C. Origin
D. Condition-based
正解:B
1364 お客様のコメント
クリック」





石岛** -
問題集の質問と解答を読むことを繰り返し、きちんと暗記して、C_TS413_1809合格できました。