A customer is considering Linux solution. There are several competitive solutions under consideration. The System z sales specialist is considering System z Solution Edition for Enterprise Linux or an IBM Enterprise Linux Server. Which of the following is included in these offering?
A. Predefined hardware, software, services
B. RACF, zAAP , DirMaint
C. IBM middleware, Extended Warranty, VMContol
D. Predefined hardware, Linux subscription, and Linux services
正解:A
質問 2:
A z114 customer has numerous UNIX servers, a large number of Windows servers, and an unidentified number of small department servers that were acquired outside of IT influence. The CIO wants to know how much they are currently spending on IT company wide. Which of the following approaches would accurately provide detailed information?
A. zCP3000
B. RACEv
C. TCO Now Study
D. Scorpion Study
正解:D
質問 3:
An HP customer is considering consolidation to a single z114 server. They mention a proprietary operating system they use heavily. Which of the following is that operating system?
A. HP UX
B. AIX
C. RH-7
D. RH-8
正解:A
質問 4:
A customer has many highly variable Linux workloads that would virtualize very well with z/VM. The customer has no z/VM skills. The customer wants to implement a capacity management and chargeback system. Which of these alternatives would be the most appropriate zEnterprise solution?
A. Linux on z/VM and IFLs with Unified Resource Manager to provide a simplified management interface
B. zBX since recent announcements shift focus away from Linux on z/VM as a viable solution
C. Linux on z/VM and IFLs with Services to setup and provide ongoing support for z/VM
D. Linux on PoOWER blades in a zBX with Unified Resource Manager for simplified management
正解:C
質問 5:
A Z114 customer is concerned about system outages. Which of the following address this concern?
A. RAID protection
B. vmWare
C. Business Resilience
D. Energy Efficiency
正解:C
質問 6:
When discussing z/OS with a new customer, WLM was presented as a key differentiator.
However, the customer countered that its current competitive system also has a workload manager. Which one is a key difference of z/OS WLM?
A. Minimizes required resources across the zEnterprise (CPC and zBX)
B. Manages processes, memory and I/O, minimizing resources
C. Can manage a multi-tier workload residing in the zEnterprise CPC and in the zBX
D. Manages in a holistic way all the workload elements running in z/OS
正解:D