In which way can you verify that STUN/TURN messages are being received from web browser at the Avaya Session Border Controller for Enterprise (SBCE)?
A. Enable traceFM with the STUN/TURN option enabled.
B. Enable traceSBC with the STUN/TURN option enabled.
C. Enable traceHTTP with the STUN/TURN option enabled.
D. Enable debug logging on SBCE and look in ipcs.log.
正解:B
質問 2:
Who is responsible for Discipline 4, Determining Root Cause, of the 8D Troubleshooting Methodology?
A. Avaya Tier 3
B. Avaya Tier 2
C. Third Party Support
D. Business Partners
正解:B
質問 3:
What is the way to check the version of Presence Services snap-in installed on the Avaya Breeze platform?
A. Using PuTTY SSH to the Avaya Breeze platform, login as cust, then execute the swversion - PresenceServices command.
B. Using Avaya Aura System Manager (SMGR) Navigate to Elements > Engagement Development Platform
> Server Administration, and read the Version displayed.
C. Using Avaya Aura System Manager (SMGR) Navigate to Elements > Engagement Development Platform
> Server Management, and read the Version displayed.
D. Using PuTTY SSH to the Avaya Breeze platform, login as cust, then execute the swversion command.
正解:B
質問 4:
Which statement about Avaya Tier 2/Business Partners is true?
A. They isolate issue, resolve issue then escalate to Tier 3 for corrective action.
B. They isolate the issue, and if no root cause is found, escalate to Tier 3 to resolve the issue.
C. They immediately escalate to Tier 3 as issue is encountered.
D. They describe the problem to Tier 3 in an escalation ticket and Tier 3 isolates and resolves the issue.
正解:B
質問 5:
To validate the initial system status of Breeze with the WebRTC Snap-I, which two components should be checked? (Choose two.)
A. application
B. licensing status
C. cluster status
D. configured certificates
E. installation status
正解:A,E
質問 6:
Which two statements describe the 8D Troubleshooting Methodology? (Choose two.)
A. It is eight steps that ensure a faster time to resolution.
B. It is eight steps used to guarantee systems are operational after an implementation.
C. It is eight steps that guarantee a thorough analysis of a failure, containment actions, full resolution, and prevention for the future.
D. It is eight steps that guarantee a logical way to isolate an issue.
E. It is eight steps that define how to escalate third-party integration issues.
正解:C,D
質問 7:
Which statement about Instant Message and Presence delivery to a SIP Remote Worker is true?
A. Presence and IM is delivered to SIP Remote Workers without passing through Session Manager.
B. Presence notifications and IM are sent to a Remote Worker via Session Manager and Avaya SBCE.
C. Presence notifications are sent to a Remote Worker via Session Manager and SBCE; IM is relayed from Breeze to Remote Worker via SBCE but without passing through Session Manager.
D. IM is sent/from to a Remote Worker via Session Manager and SBCE; Presence notifications are relayed from Breeze to Remote Worker via SBCE but without passing through Session Manager.
正解:C
質問 8:
To validate the initial system status of Avaya Breeze with the WebRTC Snap-in, which three components should be checked? (Choose three.)
A. Cluster Status
B. Configured certificates
C. WebRTC Service within Service Management > Services
D. Licensing mode
E. Installation status
正解:A,C,D
質問 9:
In an Avaya Aura Presence Services (PS) message flow, which type of message does a Remote Worker first send to PS?
A. OPTIONS
B. NOTIFY
C. SUBSCRIBE
D. REGISTER
正解:D