A new payment process will be used to process transfer requests in the US and Europe where: 1) payments should be processed on the same day of request Monday to Friday. 2) the number of European and US requests is similar per day during normal working hours. Which option illustrates the input simu lation setting that will help analyze this process?
A. Set a timetable trigger to receive requests assigning a custom timetable specifying different periods for the US and Europe.
B. Set a time trigger to receive requests using a distribution with a general timetable for the US and Europe.
C. Set a time trigger to receive requests assigning as start time a general timetable valid for the US and Europe.
D. Set a timetable trigger to receive requests assigning a general timetable valid for the US and Europe.
正解:A
質問 2:
A process analyst needs to model the flow of a loan application through a process for both documentation and simula-tion. The tasks in the process lead the analyst to believe that the application may change from verified to reviewed and to approved or declined. How should the process analyst model this requirement?
A. Use a single business item instance of the loan application with changing states.
B. Use a single business item representing the loan application throughout the process.
C. Use three separate business item templates to represent the changing states.
D. Use three business item instances to represent the changing states.
正解:B
質問 3:
A process analyst needs to model persons that may act as a Project Executive, Project Manager or Resource Manager depending on their skills. Which of the following is the BEST way to represent this requirement?
A. Create a Bulk Resource with an available quantity of 3.
B. Create three Bulk Resources; one for a Project Executive, one for a Project Manager and one for a Resource Manager.
C. Create three Individual Resources; one for a Project Executive, one for a Project Manager and one for a Resource Manager.
D. Create three Roles; one for a Project Executive, one for a Project Manager and one for a Resource Manager.
正解:D
質問 4:
Which of the following describes a purpose and outcome of process modeling?
A. simula-tion models can be used to visually analyze the real-time flow of a business process.
B. Documentation models are built at one level of detail that include business performance measurement and are intended to provide simula-tion details.
C. Definition models are built at varying levels of detail that include organizational units and business items that are intended for use in improvement opportunity identification.
D. Analysis models are built at a level of detail that includes data needed to evaluate the process in light of the business problem to be solved.
正解:D
質問 5:
What are the steps required to export a project that contains reference groups? Right-click and select Export. Select WebSphere Business Modeler. Browse to select the target directory.
A. Select Export projects in the group. Check Overwrite files.
B. Select Export entire project. Check Export projects in the group.
C. Select Export entire project. Check Overwrite files.
D. Click Export entire project. Check Export specific elements.
正解:B
質問 6:
A local task, called Prepare Package for Customer, needs to be expanded into a process consisting of several tasks, such as Wrap Package and Insert Coupon. These tasks are unique to the Prepare Package for Customer process. What should the local task be converted to?
A. local subprocess
B. multiple services
C. global subprocess
D. multiple business rule tasks
正解:A
質問 7:
A process analyst attempts to analyze a process using simula-tion and finds that the simula-tion is not running successfully. Which static analysis report should the process analyst use to determine if looping paths are preventing the simula-tion from running properly?
A. Activity throughput
B. Path cycles
C. Path unable to be followed
D. Process instance critical path
正解:B
質問 8:
Which steps would a process analyst take when conducting a simu-lation of "what-if" scenarios for a business process instance?
A. Right click on the simula-tion profile, select Profile Analysis > New Profile and change the attributes for the "what-if" scenario and then re-run the simula-tion and analyze results
B. Make a copy of the simula-tion snapshot, rename it, change the attributes for the "what-if" scenario and re-run the simula-tion and analyze the results
C. Right click on the simula-tion snapshot, select Profile Analysis > Profile Specification, and change the attributes for the "what-if" scenario and then re-run the simula-tion and analyze results.
D. Make a copy of the simula-tion profile, rename it, change the simula-tion attributes for the "what-if" scenario and re-run the simula-tion and analyze the results.
正解:D