A 2-node cluster configuration has an application server named appl. The appl server has custom application monitors named appmon_a and appmon_b.
The setting of appmon_a and appmon_b follows:
appmon_a: monitoring process=A, monitor interval=20, stabilization interval=60, restart count=1 appmon_b: monitoring process=B, monitor interval=10, stabilization interval=60, restart count=0 If process B fails 30 seconds after process A fails and successfully restarts, what is the most amount of time it will take for a failover event to begin?
A. about 80 seconds
B. about 30 seconds
C. about 10 seconds
D. about 60 seconds
正解:C
質問 2:
The administrator has written a script "correct_problem.sh" that needs to be run if the "release_vg_fs" event does not complete successfully.
What should be done to ensure the correct_problem.sh is called a maximum of 3 times if the event failed?
A. Include a retry command of correct_problem.sh and an event counter of 3
B. Include a post event of correct_problem.sh and a retry counter of 3
C. Include a recovery command of correct_problem.sh and a recovery counter of 3
D. Include a custom event of correct_problem.sh and a restart limit of 3
正解:C
質問 3:
When configuring a PowerHA Enterprise Edition cluster using San Volume Controller (SVC) replication, what other software must be installed and configured on the cluster nodes?
A. SVC Storage Manager
B. Secure Shell
C. Remote Shell
D. SVC Command Line Interface
正解:B
質問 4:
A PowerHA 7 cluster is running on two fully virtualized LPARs. An administrator simulates a network failure on the cluster by running the "ifconfig enX down" command on all network interfaces on one node. The resource group moved, and clstat shows the cluster as stable on both nodes.
What prevented the resource group from being active on both nodes?
A. The nodes are able to connect to each other via vsa interface.
B. The nodes are able to connect to each other via diskhb interface.
C. The nodes are able to connect to each other via vscsi interface.
D. The nodes are able to connect to each other via dpcom interface.
正解:D
質問 5:
The database is running on node1 and application is running on node2. The application cannot run unless database is active and the application must be stopped before the database.
What actions will ensure the application and database run correctly?
A. Configure Online on Different Nodes Dependency and set Priority Resource Group.
B. Configure Resource Group Processing Ordering and set Serial Acquisition Order.
C. Configure Parent/Child Dependency and set Parent/Child Dependency between Resource Groups
D. Configure Start After Resource Group Dependency and set Start After Resource Group Dependency.
正解:C
質問 6:
A new application is added to the cluster and verification produces an error. What is the most likely reason?
A. The application is running on one of the cluster nodes.
B. Some application dependencies are missing from one or more nodes in the resource group.
C. The size of the application start script is not the same on all of the nodes in the resource group.
D. The application start script is not executable on one of the nodes in the resource group.
正解:D