After studying the figure below, select the correct statement.
A. DataSet2 Is both the file and dataset name.
B. DataSet2 is the file name.
C. DataSet2 is the dataset name.
D. Gss93.sav is the dataset name.
正解:D
質問 2:
Which interpretation is correct for the Correlations table?
A. None of these correlations are statistically are significantly and the strongest correlations is between Var1 and Var4.
B. None of these correlations are statistically are significantly and the strongest correlations is between Var2 and Var3.
C. All of these correlations are statistically are significantly and the strongest correlations is between Var2 and Var3.
D. All of these correlations are statistically are significantly and the strongest correlations is between Var1 and Var4.
正解:A
質問 3:
In the CROSSTAB procedure, a chi-square value of zero indicates the variables are independent of each other.
A. False
B. True
正解:B
質問 4:
In the Variable View, if you have a series of variables that share the same category coding scheme, you can enter value labels for one variable, then copy these variables.
A. False
B. True
正解:B
質問 5:
What does the Customized Variable View button in the Options dialog allow a user to specify? (Select all that apply)
A. The display order of the attributes
B. The size of the Variable View window
C. The attributes that are displayed
D. The default setting of the Variable View display
正解:A,D
質問 6:
If you request an aggregate dataset or data file in the Aggregate procedure, the number of cases in the new aggregated file is equal to what?
A. Number of cases that you specified in the Aggregate Data dialogue box
B. Number of aggregated summary variables.
C. Number of categories of the variables specified in the Break Variables list
D. Number of cases in the original data file.
正解:D
質問 7:
Consider the data file below and answer the following: the calculation of means of variables X, Y, Z, is contained in the variable AV_XYZ. What method was used to calculate the mean?
A. The Compute Variable dialog and the expression (X+Y+Z)/3
B. The Compute Variable dialog and the expression X+Y+Z/3
C. The Compute Variable dialog and the expression MEAN (X.Y.Z)
D. The Compute Variable dialog and the expression MEAN, 2(X.Y, Z)
正解:D
本城** -
IBMSPSSSTATL1Pの比較的高度な知識、最新事例など深く広く問われますねぇPass4Testさん