A credit card company is going to implement a new application for which security is a major requirement. The company has been quoted a solution running in Windows.
Why should the company consider a Power Systems solution?
A. IBM AIX and IBM i have security check points that make it nearly impossible to be hacked.
B. Starting with POWER8, security is built into the processor.
C. IBM has superior firewalls.
D. PowerSC includes templates for PCI compliance.
正解:D
質問 2:
A telecommunications customer has a call detail record (CDR) query system. Due to the rapid increase of new capacity requirements, they would like to be able to increase the scalability and improve performance and availability.
Which solution can be proposed to best satisfy the customer's big data Linux requirement?
A. E880, XIV Storage System, PowerHA SystemMirror
B. S824, Spectrum Protect (TSM), Spectrum Scale (GPFS)
C. E870, Flash Storage
D. S822L, Spectrum Scale (GPFS), Spectrum Symphony
正解:B
質問 3:
A customer will purchase an IBM POWER8 server to migrate and consolidate multiple x86 workloads, but does not have personnel to perform the migration.
Which IBM resource exists to perform such migrations?
A. IBM Techline
B. IBM Lab Services
C. IBM Software Utility
D. IBM Migration Factory
正解:D
解説: (Pass4Test メンバーにのみ表示されます)
質問 4:
In addition to one System Node, what is(are) the minimum E880 hardware feature(s)?
A. Two I/O drawers and one disk expansion drawer
B. One System Control Unit
C. One I/O drawer
D. One System Control Unit and two I/O drawers
正解:B
解説: (Pass4Test メンバーにのみ表示されます)
質問 5:
An application has a high availability requirement and is implemented with two local partitioned POWER8 servers and one remote partitioned POWER8 server. One local server runs production and replicates data to the backup local server. The backup local server replicates data to backup remote server.
What is the minimum number of HMCs required to support the sites?
A. 4
B. 1
C. 3
D. 2
正解:D
有贺** -
C9010-260の問題集、読みやすく わかりやすい解説が付き、これで受かる気がしたっと思って受験して本当に受かりました。すごい。