A company has outgrown their current data center and plans to use the second data center as the new primary and needs to migrate their workloads. They are running VMware in both data centers. Which steps would allow this migration to occur without any data loss?
A. 1. Replication job
2.Failback
3.Commit failback
B. 1. Backup job
2.Instant VM Recovery
3.Finalize the Instant VM Recovery
C. 1. Replication job
2.Planned failover
3.Permanent failover
D. 1. Replication job
2.Failover plan
3.Permanent failover
正解:D
質問 2:
Figure A shows the backup files on a Scale-out Backup Repository (SOBR) created by a single Veeam backup job. The SOBR is configured to offload to capacity tier in move mode. If the offload was completed successfully, what will remain on the performance extents for the files uploaded to the capacity tier?

A. VIB and VBK files (metadata only)
B. VIB and VBK files (data blocks only)
C. VBM files (metadata only)
D. VIB files (metadata and data)
E. VBK files (metadata and data)
正解:A
質問 3:
Which of the following statements are true regarding backup copy jobs in Veeam Backup & Replication? (Choose two.)
A. During the backup copy job process, a VM snapshot is created for consistency
B. The backup copy job creates a single file with multiple restore points included within for archival purposes
C. The backup copy job creates a forever forward incremental backup chain
D. Backup copy jobs copy entire VBK, VIB, or VRB files from the source backup repository to the target backup repository
E. Retention settings maintain the desired number of restore points as well as offer optional GFS for archival purposes
正解:C,E
解説: (Pass4Test メンバーにのみ表示されます)
質問 4:
If you need to run a script to stop a service in order to get an application-consistent backup on a Windows server, where can the script be run?
A. In the guest processing setting of the job, enable application-aware processing and add a pre-freeze script to the VM
B. In the virtual machines setting of the job, add a script in the scripts tab under "Run the following script before the job:"
C. Copy the script to the VM and schedule the script to run prior to the start of the backup job using the Windows Task Scheduler in the VM
D. Configure the script to run on the Veeam Backup & Replication server using the Windows Task Scheduler
正解:C
質問 5:
A company has been running off replicated, business-critical VMs at their disaster recovery location since an earthquake near the primary data center occurred. Since the threat has passed, they want to stop the replicas and switch to the VMs at the primary data center without losing data. Which of the following actions is the first step they should take?
A. Permanent failover
B. Commit failback
C. Undo failover
D. Planned failover
E. Failover
F. Failback to production
正解:B