What is not a test benefit?
A. avoiding damage during production
B. facilitating good project control by providing information
C. avoiding repair costs and consequential loss in the production situation
D. release of a product
正解:D
質問 2:
What is not an element of a test case in relation to the system behavior to be tested?
A. defect
B. initial situation
C. predicted result
D. action
正解:A
質問 3:
See the specification of a discount campaign below:

How many equivalence classes can be distinguished from the above specification?
A. 4
B. 5
C. 3
正解:A
質問 4:
The possible results of every condition are tested at least once. To which coverage type does this refer?
A. condition/decision coverage
B. decision coverage
C. modified condition/decision coverage
D. condition coverage
正解:D
質問 5:
During the test execution of a large customer registration system, the system went down for several times. Although there were no test cases described the tester concluded that the continuity was poor. Which testing method is described here?
A. static testing
B. dynamic explicit testing
C. dynamic implicit testing
正解:C
質問 6:
See the decision and test situations below:
R = (A AND B) OR C Which test situation is missing if the coverage type decision points modified condition/decision coverage is used?


A. Option A
B. Option B
正解:B
Matsumoto -
TMPTE問題集は図表が多く、説明も丁寧で読み込むことにより合格に必要な知識を得ることができます。