Why is there a difference between source and target capacity on the Primary Capacity bar chart?
A. The source environment's occupancy is expected to shrink within 36 months.
B. There is no difference in occupancy, however less capacity is being used in the target.
C. There is less occupancy to keep in the target due to changing the client's retention policies.
D. The target environment does not include any pre-existing legacy occupancy.
正解:A
質問 2:
Which document must be completed to allow Butterfly to place collectors on the portal?
A. Pre-requisite Questionnaire
B. Target Design Document
C. Site Overview Reference
D. Purchase Order
正解:D
質問 3:
When will Butterfly produce an Analysis Engine Report?
A. When all collections are present as listed in the Pre-requisite Questionnaire (PRQ).
B. When some collections from the PRQ are listed, and there is a Target Design Guidance (TDG).
C. When all collections are present as listed in the PRQ. and there is one finalized TDG.
D. When all collections are present as listed in the PRQ. and there is any TDG.
正解:A



0 お客様のコメント