All new partners must first interview the corresponding project manager and product line technical leader before entering the area, and sign the safety production commitment letter, the network safety behavior red line commitment letter, and receive the supervision certificate before entering the area, new employees do not allow to operate the existing network equipment.
A. False
B. True
正解:B
質問 2:
Which of the following is the work done during the verification phase after "high-risk operation"?
A. Confirmation of project operation completion
B. Recording of major operational records
C. Network test verification
D. Confirm the operation board
正解:C
質問 3:
Which statements are correct about handling and unpacking inspection in the MA5800 frame series? (Multiple Choice)
A. Can use sweaty or dirty gloves to touch unpainted metal surfaces of parts or parts
B. The equipment and packaging materials of the unpacked boxes should be transferred indoors for proper storage.
C. During the handling and installation process, avoid collision of product parts with objects such as doors, walls, shelves, etc.
D. It is strictly forbidden to stand and invert the container, and it must be placed according to the direction in which the container is placed.
正解:B,C,D
質問 4:
Which of the following should be noted when charging operation? (Multiple choice)
A. Directly touch live equipment without gloves
B. Clothing must not have exposed metal objects
C. Must wear gloves
D. The metal parts outside the working surface of the tool are wrapped with tape.
正解:B,C,D
質問 5:
Which of the following statements about copper wire access are wrong? (Multiple choice)
A. The copper wire access consists of three parts: the central office access device, the copper wire distribution network and the user access terminal.
B. The equipment room distribution frame does not belong to the copper distribution network.
C. Twisted Pair is a signal transmission cable made of two or more pure copper wires insulated from each other.
D. The corridor distribution box belongs to the copper distribution network.
正解:B,C
質問 6:
Which of the following are in the scope of the MA5800 box series hardware quality standards? (Multiple Choice)
A. Signal cable standard
B. Integrated commissioning standards
C. Power and grounding standards
D. Cabinet frame standard
正解:A,B,C,D
質問 7:
Which of the following is not included in the hard-loaded standard procedure of the MA5800?
A. Software commissioning
B. Install the power and ground wires
C. Install the machine frame
D. Installing and tying the fiber
正解:A
質問 8:
What are the requirements for construction in hazardous areas? (Multiple choice)
A. Erection of warning signs and enclosure isolation measures
B. Provide appropriate safety protection for personnel in hazardous area construction, using special safe working tools
C. In the construction of hazardous areas, emergency measures and safety measures must be taken
正解:A,B,C
質問 9:
What items must be included in the PPE for aerial work? (Multiple Choice)
A. Safety helmet
B. Non-slip gloves
C. Anti-skid shoes
D. Whole body safety protection rope
正解:A,B,C,D