Which of the following statements about data flow objects in SAP BW/4HANA are true?
Note; There are 2correct answers to this question.
A. Data flow objects can be modeled in the Eclipse-based modeling tools for SAP BW/4HANA.
B. Dataflow objects are not available for SAP BW/4HANA.
C. A data flow object is a TLOGO object (transportable object) in SAP BW/4HANA and describes a data flow.
D. The data flow object is the successor of the semantically partitioned object (SPO) in SAP BW/4HANA.
正解:A,C
質問 2:
What are desired outcomes of an SAP BW/4HANA pilot project?
Note: There are 3 correct answers to this question.
A. Identify objects from SAP BI content and/or SAP HANA live that will be leveragedin subsequent projects.
B. Identify customizing and configuration areas to be applied to future projects.
C. Confirm increased database size using SAP BW/4HANA instead of a common RDBMS.
D. Transfer experience of the pilot project to future projects.
E. Identifyrequired changes for the business processes to comply with SAP BW/4HANA standard software.
正解:A,B,D
質問 3:
What is the central point of entry for all modeling tasks in SAP BW/4HANA?
A. The graphical data flow modeler in theBW modeling tools.
B. SAP BW/4HANA comes with a mobile app for modeling.
C. SAP BW/4HANA comes with a web-based modeling environment
D. Transaction RSA1.
正解:A
質問 4:
Which technology do you use to load data from Microsoft Analysis Services to SAP Business Warehouse?
A. Web service
B. Database Connect
C. Universal Data Connect
D. File interface
正解:C
質問 5:
Whatmust you do to define an inventory infoprovider in SAP BW/4HANA? there are 3 correct answers to this question.
A. Select the Inventory model property.
B. Select the Unique Data Records model property.
C. Assign at least one-cumulative key figure
D. Select the All characteristics are key model property.
E. Assign at least one cumulative key figure
正解:A,D,E
質問 6:
What are the three predefined dimensions in SAP BW?
A. Date
B. DataPackage
C. Time
D. Unit
正解:B,C,D
質問 7:
What are desired outcomes of an SAP BW/4HANA pilot project? There are 3 correct answers to this question.
A. Identify objects from SAP BI content that will be leveraged in subsequent projects.
B. Identify customizing and configuration areas to be applied to future projects.
C. Confirm increased database size using SAP BW/4HANA instead of a common RDBMS.
D. Transfer experience of the pilotproject to future projects.
E. Identify required changes for the business processes to complywith SAP BW/4HANA standard software.
正解:A,B,D
質問 8:
You load a Datastore object(advanced)every night, where can you delete the request you loaded two nights ago without deleting the last request? Please choose the correct answer.
A. From a Datastore object(advanced)based on the model template Infocube if the request is activated.
B. Froma Datastore object(advanced)based on the model template Infocube if the request is NOT activated
C. From a Datastore object(advanced)based on the model template standard Datastore object if the request is activated you execute a full load.
D. From a Datastore object(advanced)based on the model template standard Datastore object if the request is activated.
正解:B
質問 9:
What are the core predictive functions to answer business questions?
Note: There are 2 correct answers to this question.
A. Classification and regression
B. Segmentation or clustering
C. Gaussian normal distribution
D. XRF spectroscopy
正解:A,B
1038 お客様のコメント





谷口 -
解説が充実しており、とてもわかりやすかったです。このE_BW4HANA200問題集を購入して今回合格出来ました。