Why would you use phantom assemblies? Note: There are 3 correct answers to this question.
A. To reduce the number of changes required in bills of material
B. To increase the number of planning levels
C. To simplify the structure of bills of material
D. To make the assignment of components easier
E. To reduce the number of material masters
正解:C,D,E
解説: (Pass4Test メンバーにのみ表示されます)
質問 2:
You want to set up a make-to-order planning scenario for a finished material. The bill of materialcontains two components: one should be procured for each sales order individually, and the other should be procured jointly for all independent requirements Forecasting for the finished product is NOT possible. Which settings do you make to achieve this?
A. Choose planning strategy 20 (Make-to-Order) and select the corresponding ndividual/Collectiveindicator.
B. Choose planning strategy 50 (Planning without final assembly) and select the corresponding Mixed MRP indicator.
C. Choose planning strategy 50 (Planning without final assembly) and select the - corresponding Individual/Collective indicator.
D. Choose planning strategy 20 (Make-to-Order) and select the corresponding Mixed MRP indicator.
正解:A
解説: (Pass4Test メンバーにのみ表示されます)
質問 3:
You want to schedule an operation finitely, without removing other operations. Which scheduling strategy do you select?
A. Squeeze in
B. Find Slot
C. Insert operation
D. Schedule in working time only
正解:B
解説: (Pass4Test メンバーにのみ表示されます)
質問 4:
How can you characterize dependent requirements in material requirements planning?
Note: There are 2 correct answers to this question.
A. They are only created for multilevel bill of material (BOM) structures
B. They are created when an independent requirement is created for the finished product.
C. They are created with exact times in Advanced Planning.
D. They are created on assembly level during the planning run.
正解:B,D
解説: (Pass4Test メンバーにのみ表示されます)
質問 5:
What is the purpose of a reporting point confirmation in repetitive manufacturing?
Note: There are 2 Correct answers to this question?
A. To stage different components for a production line simultaneously
B. To reduce the total production lead time for a long production line
C. To determine the work in progress along the production line
D. To provide timely updates of inventory management for the staged components
正解:C,D
解説: (Pass4Test メンバーにのみ表示されます)
質問 6:
which actions does the system perform by default when you save a confirmation for a finished product in repetitive manufacturing?
Note: There are 3 Correct answers to this question.
A. Reduction of associated capacity requirements
B. posting of goods receipt for the product
C. Material staging for next order in sequence
D. Archiving of document for assembly scrap
E. Posting of production costs to the production cost collector
正解:A,B,E
解説: (Pass4Test メンバーにのみ表示されます)
質問 7:
Your company produces a finished good based on a forecast and expects it to be in stock when customers order it. If customers order more than the forecasted quantity, this must NOT have any impact on the production program. Which planning strategy do you use?
A. Planning with final assembly (40)
B. Make-to-stock production (10)
C. Planning without final assembly (50)
D. Make-to-stock production (20)
正解:B
解説: (Pass4Test メンバーにのみ表示されます)
質問 8:
Which of the following are possible configuration steps when setting up the alert monitor in Advanced Planning? Note: There are 2 correct answers to this question.
A. Create an object selection variant for priority-category-related alerts.
B. Assign the alert profile to the overall profile.
C. Create an object selection variant for production-planning-related alerts.
D. Assign the overall profile to the authorization profile.
正解:B,D
解説: (Pass4Test メンバーにのみ表示されます)