You want to display and edit data in different units of measure (UOM). Which of the following must you consider before you use UOM?
Note: There are 3 correct Answers to this question.
A. Units of measure are usually not time-dependent.
B. Conversion to the target unit of measure is handled by functionality of SAP IBP Excel UI
C. Units of measure are usually not time-independent.
D. Analytics provide the user with the option to select the target unit of measure.
E. Unit of measure is an attribute of a master data type, such as Product.
正解:A,D,E
質問 2:
Why would you set up a cascading filter in the planning view? Note: There are 2 correct Answers to this question.
A. To filter using attributes that have a large number of values
B. To filter attributes based on other attribute filters
C. To filter attributes based on specific values
D. To filter data in an Application Job template
正解:A,B
質問 3:
Which of the following approaches could you take to reduce run times of an optimizer? Note: There are
2 correct Answers to this question.
A. Increase the use of incremental lot size beyond the frozen horizon.
B. Use a subnetwork ID to reduce the size of the problem.
C. Avoid using telescopic time buckets.
D. Split into multiple planning areas to support weekly vs. daily planning needs.
正解:B,C
質問 4:
Which of the following checks for master data and key figures does the Check Mode algorithm trigger?
Note: There are 3 correct Answers to this question.
A. It checks whether the required planning level master data exists for a subset of input key figures.
B. It checks whether the location resource specified in the master data forms a cycle in the supply chain network.
C. It checks whether the heuristic detects cycles formed by nodes (such as location products) in the supply chain network.
D. It checks whether the sourcing in the Production Source Item Master Data type exists.
E. It checks whether the location products specified in the master data are connected by customer sourcing rules within the supply chain network.
正解:A,C,E
質問 5:
Which of the following data can be tracked using a change-history-enabled key figure? Note: There are 3 correct Answers to this question.
A. Modified date
B. Attributes
C. Scenario ID
D. Reason code
E. Key figure type
正解:A,B,D
質問 6:
You are creating advanced copy operators as part of an SAP IBP solution that is being implemented.
What do you need to be aware of when defining data transfer? Note: There are 2 correct Answers to this question.
A. Specifying target key figure that is time independent is possible.
B. Specifying source key figure is mandatory.
C. Selecting by attribute with option 'contain' is possible.
D. Specifying target key figure is mandatory.
正解:B,D
質問 7:
You have set up a planning area and data is available. You adjust the necessary time profile settings and run the consistency check.
Which settings can you change and still run a successful consistency check?
Note: There are 2 correct Answers to this question.
A. Change the description of the attributes in the time profile.
B. Change the past and future horizon of the levels in the time profile.
C. Add a new time profile level to the time profile.
D. Remove an attribute assigned to the time profile level if the attribute is used in a planning level.
正解:A,B
質問 8:
You are invited to review a problem with a customer's SAP IBP Excel template performance. What areas with the biggest potential performance impact would you focus on?
Note: There are 2 correct Answers to this question.
A. Number of analytics charts displaying key figures' values
B. Complex calculation graphs for key figures
C. Excessive IBP formatting in Excel UI
D. Number of local members and complexity of calculations
正解:B,C