You are attempting to create master data to test the billing process. When you perform a full installation for the device, you must input the rate type for each billing-relevant register. You enter a valid value in the rate field and choose enter.
Why might the system return an error message and prevent you from saving?
A. The device can only be installed as billing-relevant.
B. A reference value exists on the installation.
C. The rate type is configured as facts permissible.
D. The device is actually a device info record.
正解:C
質問 2:
You want to perform period-related billing using load shape data.
How would you set this up?
A. 1. Create an RTP component
2.Create an RTP formula
3.Assign the formula to a billing schema
4.Assign the RTP component to a rate
B. 1. Create an RTP formula
2.Create an RTP component
3.Assign result parameters to operand categories
4.Assign the RTP interface to a rate
C. 1. Create an RTP formula
2.Create an RTP result parameter
3.Assign the result parameter to a rate
4.Assign the RTP formula to a rate type
D. 1. Create an RTP component
2.Create an RTP interface
3.Assign result parameters to rate categories
4.Assign the RTP interface to a billing schema
正解:B
質問 3:
Which of the following must exist before an agent can create an automatic billing document?
A. Active budget billing plan
B. Posted payment
C. Billable billing order
D. Validated meter reading result
正解:C
質問 4:
You are operating in a deregulated market where a single service provider (ACME Service Provider) has multiple roles: measure grid usage and send bills to customers.
What can you conclude about ACME Service Provider's role within this market?
A. The role will be mapped to multiple service types to support measuring grid usage.
B. The role will contain a Service Provider agreement to support sending bills to customers.
C. The role will exist as the Service Provider and Invoice Service Provider on each supply contract.
D. The role will be created as division independent to support its multiple roles.
正解:C
質問 5:
Your customer has multiple portions defined, and is designing the meter reading units (MRUs) to be allocated.
Which rule is applicable?
A. A portion's MRUs must be allocated to the same regional structure elements.
B. A portion's MRUs must be allocated to the relevant billing classes.
C. A portion's MRUs must have the same scheduled meter reading date.
D. A portion's MRUs must have the same end of the meter reading period.
正解:D
山本** -
テスト本番ではほぼ同じような問題次々と出てきました。Pass4Testにかんしゃです。いつも信頼しています。