Testing effort can depend on a number of factors, which one of the following is MOST likely to impact the amount of effort required?
A. The planned use of a project management tool to schedule tasks.
B. The responsibilities for testers and developers being clearly defined.
C. The predicted number of defects and the amount of rework required.
D. The ratio of developers to testers in the project team.
正解:A
質問 2:
A student needs to score at least 50 points to pass. If they score at least 100 points they will achieve a merit and if they score at least 150 points they will achieve a distinction.
Which two values are in the same partition?
A. 45 and 170.
B. 50 and 60.
C. 55 and 120.
D. 45 and 55.
正解:B
質問 3:
Which of the following are benefits of an independent test team, and which are drawbacks?
a) Independent testers can find different defects.
b) Developers may put less emphasis on quality.
c) Independent testers can be seen as the reason for delayed projects.
d) Independent testers can verify assumptions made during the specification of a system.
A. a and d are benefits, b and c are drawbacks.
B. a and b are benefits, c and d are drawbacks.
C. b and c are benefits, a and d are drawbacks.
D. c and d are benefits, a and b are drawbacks.
正解:A
質問 4:
During the development of a software change for a system, the developer makes a mistake in his work, which leads to a fault in the code. Unfortunately, the fault is not found by software testing and is released into live.
What is the DEFINITE consequence of this mistake?
A. Contractual requirements have not been met by testing.
B. If the defect is executed, the system may fail.
C. Loss of money, time, or business reputation.
D. The system will fail, causing a defect.
正解:B
富田** -
CTFL-2018初学者でも安心、学習者のわたしのツボが分かる解説をしています。Pass4Testさんほんとうにえらいです