The design of the z13 Systems processor unit (PU) chip has been enhanced over the zEC12.
Which of the following characterizes the improvement?
A. Up to six active cores per chip on z13 compared to four active cores on zEC12.
B. Larger cache level sizes on z13 compared to zEC12.
C. Improved cryptographic and compression engine shared over all cores.
D. Faster processor cycle time on z13 (5.5 GHz instead of 5.0 GHz on zEC12).
正解:B
解説: (Pass4Test メンバーにのみ表示されます)
質問 2:
A customer is planning to permanently.
Which capacity offering shall be used?
A. Customer Initiated Upgrade (CIU)
B. Capacity for Planned Event (CPE)
C. On/Off Capacity on Demand (On/Off CoD)
D. Capacity Backup (CBU)
正解:A
解説: (Pass4Test メンバーにのみ表示されます)
質問 3:
A customer is planning to use a z13s with two CPC drawers as an external coupling facility.
What is the maximum number of Internal Coupling Facility (ICF) processors that can be used?
A. 20
B. 24
C. 10
D. 12
正解:C
解説: (Pass4Test メンバーにのみ表示されます)
質問 4:
What product provides a web-based framework for accessing and managing a z/OS system form an http-based web browser?
A. TKE
B. z/OSMF
C. IBM Cloud orchestrator
D. HMC
正解:B
解説: (Pass4Test メンバーにのみ表示されます)
質問 5:
Which of the following correctly describes the term "RTO"?
A. The length of time it takes to recover from an outage and resume normal operations.
B. The time it takes GDPS to recognize an outage and begin its recovery processes.
C. The time it takes to declare a disaster.
D. The data loss time calculated by taking the time of an outage minus the last consistency group time.
正解:A
解説: (Pass4Test メンバーにのみ表示されます)
Yoshino -
覚えてきた問題が試験にも同じのが出てて良かったです。合格しました。C9030-644問題集で良かった。