Which of the following is an element used for Disaster Recovery purposes?
A. Enhanced book replacement
B. Unified Resource Manager
C. Capacity BackUp (CBU)
D. Redundant FICON channels
正解:B
質問 2:
65 A customer purchased a second data center and was using it for a warm disaster recovery site for distributed systems.
The customer currently uses another vendor and tape backup for their mainframe DR
If the customer configures replicated disk to the warm DR data center , together with a z Systems server with CBU, they could achieve which of the following?
A. Electric utility savings Control over the DR environment Cost savings over the current DR contract
B. Improved RTO Improved RPO Control over the DR environment
C. Control over the DR environment Consistent Network to distributed systems Cost savings over the current DR contract
D. Improved RTO Improved RPO Electric utility savings
正解:A
質問 3:
Which of the following is an element used for Disaster Recovery purposes?
A. Enhanced book replacement
B. Unified Resource Manager
C. Capacity BackUp (CBU)
D. Redundant FICON channels
正解:B
質問 4:
A customer is asking IBM for help to build a plan for business continuity.
Which of the following should sales specialist recommend?
A. Engage BCRS
B. Schedule a Techline Assessment
C. Propose a GDPS solution
D. Contact an IBM Lab Specialist to assist
正解:A
質問 5:
Which of the following business reasons would make having a resilient environment essential?
A. Audit and regulatory compliance Service Level Agreement penalties Opportunity Loss Industry Governance
B. Labor Costs Audit and regulatory compliance Service Level Agreement penalties Opportunity Loss
C. Labor Costs Audit and regulatory compliance Service Level Agreement penalties Opportunity Loss
D. Audit and regulatory compliance Utility Costs Network and Database Latency Opportunity Loss
正解:A
質問 6:
A customer has a z13 server. They plan to use STP for accessing an external time source (UTC).
Which of the following techniques can be used to get the time information in this scenario?
A. Edit PR/SM to connect oscillator cards to tlsdate server
B. SE dial out to an external time reference
C. Use of an external time reference (9037-002) in an STP Mixed CTN (Coordinated Timing Network)
D. Configuration of a NTP client on the HMC which assesses an external NTP server
正解:C
質問 7:
A customer runs production on one z13, with a z196 as a backup. The customer is planning a 50% capacity increase on both machines.
Which of the following options can be considered?
A. A z13 upgrade and CBU for the z196
B. A z13 upgrade, and ON/OFF CoD for the z196
C. A z13 upgrade, and an equivalent z196 capacity upgrade for the backup situation
D. A z13 upgrade, and a z196 upgrade to a newer generation model
正解:B
質問 8:
IBM's Mobile Workload Pricing for z/OS can potentially help a client reduce the cost of:
A. z Systems New Application License Charge (zNALC) software
B. z/OS Value Unit Edition Software
C. Monthly License Charge (MLC) software
D. One Time Charge (OTC) softwware
正解:C
解説: (Pass4Test メンバーにのみ表示されます)
佐藤** -
C9030-634勉強資料を見つける前に、私はオンライン広告を信じていません。私は非常に忙しくて,試験に準備する時間がない。C9030-634問題集を勉強して,試験に合格しました!大変嬉しいです!