A customer's IT environment includes one z13 running at the latest z/OS and DB2 levels. Due to exponential business growth, they are unable to generate reports in a timely fashion. DB2 queries are now taking hours instead of minutes and this is not acceptable, according to their own Service Level Agreements (SLAs).
Which option should be offered to this client?
A. Connect the z13 to an IBM DB2 Analytics Accelerator,
B. Connect the z13 to a PureData System for Analytics.
C. Reconfigure the z13 to a zEnterprise Analytics System 9700.
D. Connect the z13 to a PureData System for Operational Analytics.
正解:A
質問 2:
A customer with offices in a large metro area uses CICS and ADABAS on an older z10 EC mainframe. They also have a PC server environment administered by a separate IT sub-organization. The distributed environment consists of several dozen x86 and rack-mounted blades running a mixture of HTTP/web serving, many small DBMSs (i.e., SQL-Server, Oracle, Informix) and a few Windows-based locally-written applications.
Which of the following would be an effective strategy to evaluate modernization options for their systems environment?
A. zCP3000 capacity projection
B. RACEv comparison
C. Fit for Purpose workshop
D. zPCR model
正解:B
質問 3:
A customer has identified their workload requirements for a replacement z Systems processor. The sizing has been completed. The CIO is considering a three-year plan for this upgrade. The CIO is asking the sales specialist for advice.
Which of the following capabilities allow customers to better manage their workload requirements, considering cost and growth?
A. Plan Ahead Capacity and CBU
B. Granularity and Capacity on Demand
C. IBM SmartCloud and CloudBurst
D. SpecialtyEngines and Linux
正解:B
質問 4:
An installed z Systems customer has asked for assistance determining what size processor would be needed to handle their future growth. They estimate growth of approximately 5% a year for the next five years.
Which of the following would be the most appropriate action?
A. Engage ATS to benchmark the customer's workload.
B. Perform a z Systems assessment using the RACEv tool.
C. Perform a zCP3000 analysis.
D. Use the customer's growth estimate and an IBM MIPs chart to project requirement.
正解:D
質問 5:
Focusing on Infrastructure as a Service (IaaS), which product utilizes multiple platforms to provision Cloud solutions that span multiple architectures, including z Systems?
A. SmartCloud Provisioning
B. CloudBurst
C. SmartCloud Foundation
D. CloudSpace
正解:C
質問 6:
Which stakeholder is the key advocate for the innovation and competitive advantage provided by a Cloud solution?
A. Chief Financial Officer
B. Chief Executive Officer
C. Chief Information Officer
D. Information Technology Manager
正解:C
質問 7:
A resiliency plan must address which of the following business requirements?
A. Provide intrusion detection and security.
B. Comply with software terms and audit requirements.
C. Address government data privacy regulations and guidelines.
D. Prepare for scheduled and unscheduled events.
正解:A
質問 8:
A customer with a small subcapacity model z13 402 is thinking about moving distributed Linux applications onto their existing mainframe. The customer seems hesitant, because they believe the reduced capacity processors may negatively influence Linux performance.
What would be the appropriate argument for a Linux on z Systems solution?
A. Linux on z Systems benefits mainly from other factors, such as memory affinity and improved instruction pipes and is therefore not dependent on processor speed.
B. The Large Memory option compensates for the reduced processor speed.
C. Specialty engines (e.g. IFLs) operate at full speed and are therefore not affected by the subcapacity setting.
D. The customer should think about moving to a full capacity model with more than one CP drawer as Linux on z Systems requires fast processors and a large memory configuration.
正解:C
Amatsubo -
これC9030-633をおさえておけば得点アップにつながることは間違いないっす。また、資格勉強のためだけでなくC9030-633がどんなものか知りたい方にもおすすめできます。