Which of the following can be moved from a 770 to an EB70 when doing a migration?
A. PCIe 5802/5877 I/O drawer
B. EXP24S SFFGen2-bay drawer
C. Memory DIMMs
D. EXP30 SSD I/O drawer
正解:A
質問 2:
Which is the component of the memory chip of Power8 CDIMMS introduces?
A. Memory XXXXXMemory ManagementMemory Buffer
B. Memory SchedulerMemory ManagementMemory XXX
C. Memory SchedulerMemory XXXXMemory Buffer
D. Memory SchedulerMemory ManagementMemory Buffer
正解:A
質問 3:
A customer has ordered Capacity on Demand (CoD) for their server, and would like to implement it in their environment.
To use CoD, they download an activation code from the IBM:
A. CoD website and enter it into their partition profile.
B. Entitled System Support website and enter it in their partition profile.
C. Entitled System Support website and enter it into their HMC.
D. CoD website and enter it into their HMC.
正解:D
解説: (Pass4Test メンバーにのみ表示されます)
質問 4:
Customers want to rebuild AIX, IBMi and Linux logical partitions on a secondary physical server, so that it can use when the primary server fails.
Which of the following features provide this function?
A. remote reboot
B. Inactive Partition Mobilitr
C. Live Partition Mobility
D. Remote Recovery
正解:C
解説: (Pass4Test メンバーにのみ表示されます)
質問 5:
How is the 19 inch PCIe Gen3 I/O Expansion Drawer connected on POWER8 systems?
A. Optical CXP Converter Adapter
B. GX++ Bus
C. PCIe Gen3 InfiniBand Adapter
D. PCIe x8 SR-IOV Adapter
正解:A
解説: (Pass4Test メンバーにのみ表示されます)
質問 6:
A customer runs POWER7+ servers managed by the HMC 7042-CR4 with firmware
V7R7.9.0.
The customer will purchase a Power E870 server and wants to manage all servers from the same HMC.
How can this be accomplished, if necessary?
A. Purchase a 7042-CR9 HMC.
B. The current HMC configuration already meets the customer requirements.
C. MES the existing HMC to a 7042-CR5.
D. Upgrade the HMC code to V8R8 2.0.
正解:D
解説: (Pass4Test メンバーにのみ表示されます)
1043 お客様のコメント





Abe -
1度目で楽にC9010-262の試験に合格できた。勉強時間は20時間ほど。Pass4TestのC9010-262問題集のおかげです。