Which characteristics of the POWER8 system can optimize Big Data solutions?
A. internal separation betrayal
B. IO extension drawer
C. Memory bandwidth
D. 40GbE FCoE adapter
正解:C
質問 2:
A customer is considering the purchase of a new EB70. They plan to attach it to an existing
V70W using the low profile 8Gb Fibre Channel adapter.
Which IBM resource should be used to find the supported solution?
A. System Storage Interoperation Center (SSIC)
B. Configurator (e-config)
C. Knowledge Center
D. System Planning Tool
正解:D
質問 3:
A customer with a Power 780 (9179-MHD) is considering a model conversion to the Power
E8SO (9119-MH E). They currently have Elastic COD enabled.
Which of the following steps will need to be completed for them to continue using Elastic
COD on the E880?
A. Convert static activations to mobile activations when placing the upgrade MES order for the new E880.
B. Prepay for Elastic COD usage when placing the upgrade MES order for the new E880.
C. Reorder the Elastic COD enablement feature= when placing the upgrade MES order for the new.
D. Reorder the Utility COD enablement features when placing the upgrade MES order for the new. E880.
正解:A
質問 4:
A customer has an existing IBM E850 HA cluster that they are using for the SAP DB. They want to use HANA and would like to have the E850 to be repurposed for this.
The E850 is a 32-core 1TB server with all cores and memory active. Only 50% of the memory is populated using 64GB CDIMMs. The HANA DB requires 3TB.
What would need to be done, if anything, to support this requirement?
A. Fill all memory slots with 128GB CDIMMs and activate another 2TB of memory.
B. Nothing can be done because the E850 only supports a maximum of 2TB.
C. Add sixteen 128GB CDIMMs and activate another 2TB of memory.
D. Purchase the E850 HANA edition specifically configured for SAP.
正解:C
解説: (Pass4Test メンバーにのみ表示されます)
質問 5:
A customer is designing a highly scalable cloud management and deployment solution using PowerVM NovaLink.
What does it mean when the HMC uses co-management mode?
A. Both the HMC and NovaLink can manage the system
B. Both FSPs must be connected to the HMC
C. Novalink requires two connections to each PowerVM instance
D. Dual HMCs will be required to manage the system.
正解:D
質問 6:
A Customer wants the new E870 installed in existing 19-inch rack.
What clients should consider?
A. If you specify the appropriate properties on the order, there will be no rack when the system deliver it
B. The system can only be installed in the 24-inch rack.
C. The system only comes with IBM rack for shipment. Customers need to remove it from the rack after the goods arrival.
D. The system can only be installed to specific IBM rack. Do not allow the use of non-IBM rack.
正解:D
質問 7:
A customer is considering a new POWER8 system. They want internal SSDs and HDDs to be virtualized to IBM i partitions using VIOS.
What should be considered when making this decision?
A. vSCSI must be used to virtualize the disk in VIOS.
B. The IBM i OS will use EasyTier to balance hot and cold data.
C. VIOS will use integrated IBM i capabilities to balance hot and cold data.
D. The SSD and HDD can share the same EXP24S drawer.
正解:A
解説: (Pass4Test メンバーにのみ表示されます)
小林** -
幸い試験に合格しました。本当に助けになりました。
平日の仕事は忙しくて、講座に行きたいけど、全く時間が無い。C9010-262問題集をかけて、簡単に勉強できる。本当に助かりました。