A planner has a requirement to track records via the Inventory application as well as the Assets application.
What type of item can be used to track these records?
A. rotating
B. material
C. non-rotating
D. standard
正解:A
質問 2:
A company has a requirement to share calendar, classification, job plan, item description and PM data.
What needs to be created?
A. Multiple organizations with a shared site environment
B. Multiple organizations with multiple sites per organization environment
C. Multiple organizations with one site per organization environment
D. Single organization, single site environment
正解:D
質問 3:
A planner has a high priority work order which is going to consume an item with limited availability and wants to ensure that the item is dedicated to this work order. What type of reservation should the planner use?
A. BACKORDER
B. APSOFT
C. SOFT
D. HARD
正解:D
質問 4:
A user has entered a material receipt in error and wishes to correct it.
Which action should be performed?
A. Return Material
B. Cancel Receipt
C. Void Receipt
D. Credit Invoice
正解:C
質問 5:
After creating and approving a non-contract related invoice for a previously received item, it was found that the item was defective and returned to the vendor. Which process should be used to correct the invoice?
A. Cancel the invoice
B. Create a credit invoice
C. Cancel the associated purchase order
D. Create a reverse invoice
正解:D
質問 6:
A company is training on the use of the material status fields on work orders.
What are the possible status values available for these fields?
A. COMP, NONE, PARTIAL
B. AVAIL, NOTAVAIL, PARTAVAIL
C. ONORDER, PAVAIL, READY
D. WMATL, AVAIL, NONE
正解:A
質問 7:
An asset requires a diagnostic evaluation every 3 months and an oil change every 18 months. It has been decided to use Job Plan sequencing to generate the work orders at the appropriate interval where Job Plan A represents the 3-month diagnostic and Job Plan B represents the 18-month oil change.
What are the Job Plan sequence values to accomplish this?
A. Job Plan A=1 and Job Plan B=18
B. Job Plan A=1 and Job Plan B=6
C. Job Plan A=3 and Job Plan B=6
D. Job Plan A=3 and Job Plan B=18
正解:D
質問 8:
A user tries to edit a meter in the Manage Meter Reading History dialog in the Assets application but finds that all the fields are read only.
Which of these meter types can be modified through this dialog?
A. CONTINUOUS
B. DIAL
C. GAUGE
D. CHARACTERISTIC
正解:A