Which property applies for consumption with planning strategy 40 (planning with final assembly)?
A. Consumption can reduce the originally planned production quantity.
B. Consumption can result in subsequent adjustments of planned receipts.
C. Consumption creates a static and binding assignment between the planned independent requirements and the customer requirements for the entire procurement process.
D. Consumption takes place with the planning material.
正解:B
質問 2:
What do you have to consider, when you use the ATP (Available To Promise) checks for material? (Choose two)
A. ATP checks are mandatory for lead-time scheduling.
B. ATP checks are used to evaluate the free capacity on a certain work center.
C. ATP checks can be carried out automatically when releasing a production order.
D. ATP checks can be adjusted to also consider future requirements and receipts.
E. ATP checks are automatically performed during Material Requirements Planning (MRP) runs.
正解:C,D
質問 3:
What features related to process orders can be used to fulfill Good Manufacturing Practices (GMP) requirements? (Choose three)
A. Approved master recipes
B. Resource selection
C. Availability check
D. Electronic batch record
E. Digital signature
正解:A,D,E
質問 4:
Which property applies for consumption with planning strategy 40 (planning with final assembly)?
A. Consumption can reduce the total originally planned production quantity.
B. Consumption creates a static and binding assignment between the planned independent requirements and the customer requirements for the entire procurement process.
C. Consumption takes place with the planning material.
D. Consumption can increase the total originally planned production quantity.
正解:D
質問 5:
Which of the following are properties of ECC Multi-Site Planning? (Choose two.)
A. Both withdrawal from alternative plant and withdrawal from another plant are defined via special procurement keys.
B. When using one-step stock transfer posting, transfer stock is created in the receiving plant.
C. The use of scope of planning (cross-plant total planning) is mandatory for Multi-Site Planning.
D. When using two-step stock transport order with delivery, the receiving plant is defined as a customer.
正解:A,D