Which are the mandatory preconditions for an attribute that can be used for saving the segmentation results?
Note: There are 2 correct Answers to this question.
A. It belongs to a simple or compound master data type.
B. It should be a non-key attribute of the master data type.
C. Its data type is INTEGER and its length has been specified.
D. The length of the attribute needs to be 18 digits.
正解:A,B
質問 2:
What does ABC/XYZ segmentation allow you to do? Note: There are 2 correct Answers to this question.
A. Identify inventory items that require closer attention.
B. Assign more appropriate inventory algorithms to planning objects.
C. Tailor your forecast strategy and inventory optimization to segment characteristics.
D. Analyze forecast accuracy by product class.
正解:C,D
質問 3:
Which supply chain challenge is addressed by SAP IBP for demand?
A. Inability to understand and shape actual demand
B. Inability to respond to short-term changes in supply and demand
C. Inability to arrive at consensus demand
D. Inability to synchronize supply and demand
正解:A
質問 4:
Which of the following stages can be modeled using scenarios from the S&OP planning cycle?
Note: There are 2 correct Answers to this question.
A. Data input review for inventory
B. Demand sensing stage
C. Demand-supply balancing
D. Demand review
正解:C,D
質問 5:
What are some of the prerequisites for configuring a planning area that results in a successful consistency check? Note: There are 2 correct Answers to this question.
A. Assign the compound master data type and its component master data types.
B. Configure at least one calculated key figure for the planning area.
C. Configure at most two input key figures on the same planning level in a key figure calculation.
D. Specify a planning horizon in the planning area for each level of the assigned time profile.
正解:A,D
質問 6:
You need to create time periods for the time profile in a planning area. What should you be aware of when executing the Create Time Periods application job?
A. This application job can be run for multiple time profiles at once.
B. This application job cannot be scheduled for immediate start.
C. The planning area with this time profile must be activated so that the application job can proceed.
D. A time profile has to be activated so that the application job can proceed.
正解:C
質問 7:
The Analytics Advanced app allows you to work with different types of charts. What can be the origin of the charts you can work with?
A. Custom Alerts
B. Dashboards Advanced
C. SAP IBP VBA Add-in template
D. Process Templates
正解:C
質問 8:
What is a prerequisite for modeling outsourced manufacturers with production capacity?
A. Ensure that multiple modes of transportation are set up.
B. Model target inventory and stocks at the outsourced location.
C. Model production costs for internal and external production resources to model priority.
D. Use production lead times and offsets to manage components at the outsourced location.
正解:C
Nishimura -
試験直前チェックして、無事合格でした。C_IBP_2202の問題集で助かりました。問題集はとてもほうふで、なのにわかりやすかったです。今回の試験には受かる気がします。