You are using the document management system (DMS) . Where should the DMS document links be assigned, to have them automatically copied to production orders?
There are 2 correct answers to this question.
Response:
A. Routing header
B. Work center
C. Material master
D. Bill of material
正解:C,D
質問 2:
Which reports can you access via the order and resource reporting transaction in advanced planning?
There are 3 correct answers to this question.
Response:
A. Planning file entries
B. Operation list
C. Production overview
D. Production list
E. WIP list
正解:B,C,E
質問 3:
What is the first step in the MRP run?
Please choose the correct answer.
Response:
A. Lot size calculation
B. Net requirements calculation
C. BOM explosion
D. Source determination
正解:B
質問 4:
In which material master views can you select the batch management checkbox?
There are 2 correct answers to this question.
Response:
A. Basic Data 1
B. MRP 4
C. Purchasing
D. Work Scheduling
正解:C,D
質問 5:
A customer is considering switching from order-related settlement to product-related settlement. What are capabilities of cost collectors?
There are 2 correct answers to this question.
Response:
A. They can be applied to make-to-stock production order.
B. They can be used for manufacturing with collective orders.
C. They can be used for repetitive manufacturing.
D. They can be created automatically during month end process.
正解:A,C
質問 6:
What Kanban status automatically posts goods receipt with reference to the procurement element?
Please choose the correct answer.
Response:
A. Full
B. Empty
C. In use
D. Wait
正解:A
質問 7:
What are properties of MRP Live?
There are 2 correct answers to this question.
Response:
A. The code is written in SQL Script
B. It uses the same BAdis as classic MRP
C. It is executed on the database server
D. Data is read sequentially from the database tables
正解:A,C
質問 8:
The pegging situation was changed because of an MRP heuristic run. What is a capability of dynamic pegging?
Response:
A. It enables the propagation of network alerts across the bill of materials structure
B. It links receipts from an alternative location in case of a shortage in the default location
C. It propagates changed sales order priorities to the pegged planned orders
D. It replaces fixed pegging relationships unless they have been created for stock
正解:B
1447 お客様のコメント
クリック」





Azuma -
この問題集はたぶん過去10年間の最頻出問題と
これから出題される可能性が高い最新問題の傾向を
徹底分析し、2019年確実に合格するための問題を選んでいますね。間違いないです。