Due to changes in management structure, a Power customer is questioning the cost effectiveness of Power Systems servers as compared to HP ProLiant servers.
Which response addresses the issue?
A. Power Systems servers typically have a lower software cost.
B. Power Systems servers typically have a lower total cost of acquisition.
C. Power Systems servers typically have a lower environmental cost.
D. Power Systems servers typically have a lower total cost of ownership.
正解:D
質問 2:
A customer has two production IBM POWER7+ 750s in the same data center. The customer has an application in an LPAR that needs to run 24x7. What is required to allow the planned migration of that LPAR to the second system?
A. A shared Hardware Management Console One dedicated core on each Power 750
B. Systems Director Enterprise Edition A common shared processor pool on each Power 750
C. PowerVM Standard Edition Dual system accessibility to virtual SCSI or virtual Fibre Channel
D. PowerVM Enterprise Edition on both systems SAN storage accessible to the VIO Servers on each Power 750
正解:D
質問 3:
A customer is moving a small application from an existing POWER7 server to a new system in a new location. They will be moving an existing 12X I/O drawer to the new server
Which of the following configuration will support a 12X PCI-X expansion drawer?
A. A4-corePower 710
B. A 6-core Power 720
C. A 6-core Power 730
D. A 4-core Power 720
正解:B
質問 4:
A customer has an 18-core POWER7 750 with 512GB of memory. The customer anticipates 100% growth in the next year and needs to add capacity. The customer has requested a proposal by the end of the week.
What is the next step in determining how much capacity needs to be added?
A. Use the AME tool to determine if additional cores and memory can be added to the existing system.
B. Activate Trial Capacity on Demand processors to determine how much processing capacity will be needed.
C. Engage the Benchmark Center to simulate the anticipated growth so the correct upgrade can be determined.
D. Conduct a study to determine how much processor, memory and disk storage is currently utilized.
正解:D
質問 5:
A company has HP and Dell servers installed. The company wants to consolidate all the existing ERP solutions to SAP or to Oracle ERP Suite on a single sewer. An RFP has been issued and must be answered.
What key strategy should be considered when answering the REP?
A. Focus on reliability, availability, scalability and I/O bandwidth of Power Systems sewers.
B. Suggest IBM Systems Director VMControl for consolidated management of different applications on Power systems.
C. Consider a three tier approach with Web, application and database on different sewers.
D. Present AME as a significant performance advantage.
正解:A
質問 6:
A customer has let their Software Maintenance (SWMA) expire and needs to activate additional processors on their Power 770. What does the customer need to purchase?
A. Additional licenses for the new processors.
B. New licenses for the both the existing and new processors.
C. Additional licenses for the new processors and After License Fee for the existing processors.
D. After License Fee for both the new and the old processors.
正解:C
質問 7:
What is the function of Live Partition Mobility?
A. The ability to move active logical partitions from one system to another without downtime
B. The ability to provide reliable failure detection and automated recovery of partitions
C. The ability to dynamically reconfigure a logical partition, without the need to shut down
D. The ability to relocate an application from one partition to another without restarting
正解:A
質問 8:
Which tool will help create a strong ROI case for a server consolidation opportunity?
A. SmartCloud Enterprise Monthly Cost Estimator
B. Economic Replacement Tool
C. The AlineanTool
D. Consolidation Discovery and Analysis Tool
正解:C
Kishihara -
A4040-122問題集一つで万全の試験対策が出来て素敵な問題集になっている。Pass4Testさんすごい