You are given a job requirement that requires calculations based on the latest currency exchange rate. You decide to invoke a Web service to obtain the latest exchange rate.
What are two ways that you can perform a Web service invocation in a DataStage job to obtain the latest exchange rate? (Select two)
A. Use Web Services Client stage as a lookup.
B. Use Web Services Transformer stage.
C. Use WISD Input stage.
D. Call a Web Service using a DSRoutine inside the Parallel Transformer stage.
正解:A,B
質問 2:
Records in a source file must be aggregated for further processing. Which two conditions would require the use of a Transformer stage instead of or in addition to an Aggregator stage? (Choose two.)
A. A global aggregation across all partitions is needed.
B. The data hasn't been sorted or grouped.
C. The aggregation is a custom formula for your enterprise.
D. Aggregation results outside of a certain range need to be flagged as abnormal.
正解:C,D
質問 3:
What are two fundamental functions of the Information Server Source Code Integration based on the Eclipse Team framework? (Choose two.)
A. Rollback Changes
B. Replace from Source Code Control Workspace
C. Commit Changes
D. Send to Source Code Control Workspace
正解:B,D
質問 4:
DataStage offers database connectivity through connectors, native parallel and plug-in stage types. Which two statements are correct? (Choose two.)
A. ODBC API is a plug-in stage.
B. For maximum parallel performance, scalability, and features it is best to use the native parallel database stages.
C. The connector stage offers better functionality and performance and is the best to use.
D. Next to the connector stage it is best to use the native parallel database stages.
正解:C,D
質問 5:
Which three source stages require a schema file when using RCP? (Choose three.)
A. File Set Stage
B. Data Set Stage
C. Column Export Stage
D. Complex Flat File Stage
E. External Target Stage
正解:A,C,E
質問 6:
Your job sequence must be restartable. It runs Job1, Job2, and Job3 serially. It has been compiled with "Add checkpoints so sequence is restartable". Job1 must execute every run even after a failure. Which two properties must be selected to ensure that Job1 is run each time, even after a failure? (Choose two.)
A. In the Job1 Activity stage set the Execution action to "Reset if required, then run.".
B. Set trigger on the Job1 Activity stage to "Unconditional".
C. Use the Nested Condition Activity with a trigger leading to Job1; set the trigger expression type to "Unconditional".
D. Set the Job1 Activity stage to "Do not checkpoint run.".
正解:A,D
質問 7:
You need to find the differences between the jobs in the Test project and theit older version in the Production project. You discover that the Production project is on another domain. What feature would find the differences in a job that is in a project on a different domain?
A. Cross Project Compare
B. Cross Domain Compare
C. Export from the other domain and import into a project in the same domain as the one you are working in.
D. DataStage Version Control
正解:A
質問 8:
The Teradata Enterprise stage uses a distributed FastExport to access data. What is a limitation to distributed FastExport?
A. Multiple-AMP requests are allowed.
B. Aggregates and most arithmetic operators in the SELECT statement are allowed.
C. Non-data access (e.g., pseudo-tables like DATE or USER) is allowed.
D. The use of the USING modifier is allowed.
正解:A