An architect is tasked with the following:
Build a private cloud solution for an organization using VMware vRealize Automation.
This private cloud needs to manage two different datacenters separated geographically.
The private cloud solution needs to be highly available.
Which of the following approaches can the architect take to achieve this?
Note: VMware Identity Manager has been renamed as VMware Workspace ONE Access.
A. Deploy a Workspace ONE Access cluster in a multi-site design architecture with 3-nodes spanning both the datacenters.
B. Deploy a Workspace ONE Access cluster in a multi-site design architecture with 3-nodes in each of the datacenters.
C. Deploy a single-node Workspace ONE Access instance in a single-site design architecture in one of the datacenters.
D. Deploy a 3-node Workspace ONE Access cluster in a single-site design architecture in one of the datacenters.
正解:B
質問 2:
An organization has onboarded a new business unit whose role is to test the applications 5 days prior to the release date. The Service Broker administrator should allow a 2-day extension for these deployments before they are deleted permanently.
Which two options must be configured in the lease policy to meet the requirements? (Choose two.)
A. A total maximum lease of 7 days
B. A grace period of 5 days
C. A maximum lease of 7 days
D. A total maximum lease of 5 days
E. A maximum lease of 5 days
正解:A,C
質問 3:
The operations team is onboarding new interns in Active Directory. The interns need to work in the company's vRealize Operations environment while maintaining corporate security compliance. The intern Active Directory group should only have PowerUser role to a specific vCenter cluster and ReadOnly for all other objects.
Which option would meet the requirements?
A. Add the interns to a new vRealize Operations Active Directory Group. Import the Active Directory group and grant access to relevant objects and all actions for the specific vCenter cluster.
B. Create a new Active Directory group for interns. Synchronize intern Group, create a new role for the interns and assign appropriate permissions on objects.
C. Create new Active Directory accounts and import the intern user accounts. Create a new role for the interns and assign appropriate permissions on objects.
D. Add the interns to the existing vRealize Operations administrators Active Directory group and grant access to relevant objects and all actions for the specific vCenter cluster.
正解:C
質問 4:
What level of design will contain an automation platform, an operational monitoring platform, and a desktop platform?
A. Logical Design
B. Conceptual Design
C. Detailed Design
D. Physical Design
正解:A
質問 5:
An architect has designed a vRealize Log Insight (vRLI) cluster for an organization. Details of the cluster are provided below:
3-node vRealize Log Insight cluster to collect logs for an organization NFS storage is enabled for archival data Once the NFS storage is full, which will be the resulting scenario?
A. vRLI will further compress the active logs to make more space available in NFS storage.
B. vRLI will automatically delete the oldest archived logs, resulting in archived data loss.
C. vRLI will stop ingesting new data and unless free space is available, loss of data will occur.
D. vRLI will send a notification and automatically disable log archiving.
正解:C
質問 6:
Consider the following requirements to be used in determining a vRealize Operations licensing model:
Authentication provided by Single Sign On
Performance monitoring and analytics for 12 Hosts and 1 vCenter
vSphere security and compliance monitoring for PCI and HIPAA
Guided remediation for discovered issues
Customizable dashboards, reports and views
Using the requirements, what is the minimum license that can be used for this deployment of vRealize Operations?
A. Standard
B. Advanced
C. vRealize Cloud Universal Enterprise
D. Enterprise
正解:B