Which of the following steps does a customer use to upgrade the firmware on the AMM to the latest level?
A. Open a Web browser and log on to the AMM?in the navigation frame, click AMM Firmware Update under AMM Control? click Browse? select the .pkt file? click the Upgrade/Update button
B. Telnet to AMM?from the Main Menu, select Update? browse to the downloaded .pkt file
C. Open a Web browser and log on to the IMM?in the navigation frame, click IMM Firmware Update under IMM Control? click Browse? select the .exe file? click the Upgrade/Update button
D. TFTP to the AMM?from the Main Menu, select Update? browse to the downloaded .exe file
正解:A
質問 2:
A medical customer has an installed HS21 blade with no local disk. They are attempting to set up boot from SAN using a Windows 2003 CD. Which sequence is correct for this procedure?
A. Configure the blade UEFI to boot from SAN, configure the LUN and zone for the target server, and then install Windows from the CD using theQLogic driver provided on the CD
B. Install Windows from the CD using theQLogic driver provided on the CD, configure the LUN and zone for the target server, and then configure the blade UEFI to boot from SAN.
C. Configure the LUN and zone for the target server, install Windows from the CD and press F6 when prompted to supply the driver, and then configure theQLogic adapter BIOS to boot from SAN.
D. Configure the LUN and zone for the target server, configure theQLogic adapter BIOS to boot from SAN, install Windows from the CD, and then press F6 when prompted to supply the driver.
正解:D
質問 3:
What is the correct procedure to update the UEFI on HX5 with MAX5 blades without using the AMM?
A. Mount the IMM virtual disk
B. Insert theServerGuide CD/DVD, boot the HX5 blade and follow the prompts
C. Boot the blade from the HX5 Bootable Media Creator (BoMC) and follow the prompts
D. Press F1 when the HX5 system is booting, select Update UEFI, insert the CD/DVD and select OK
正解:C
質問 4:
A retail company plans to consolidate 180 existing dual processor Xeon servers, all running a web server application on Windows Server 2003. They are planning consolidating to a single x3950 X5 running vSphere. Which of the following should be discussed with this customer?
A. What is the average CPU utilization of the existing webservers
B. Consider two servers for redundancy and failover
C. Will the servers need a SCSI orFibre Channel storage solution?
D. Is the web content static or dynamic information
正解:B
質問 5:
A banking customer orders three IBM BladeCenter E chassis and thirtyfour
HS22 blades. The customer wants to fully populate the chassis with blades where possible.
Which of the following is the minimum number of power cables required to provide redundancy?
A. 8
B. 10
C. 6
D. 12
正解:B
歌野** -
効率的にできます。
解説されているので、基礎知識を身に着けるにはとても良いですね。ア