Work Process Flow Control is set of business rules built into the work management applications that allow status changes to be processed automatically in a work hierarchy - from parents to children, between siblings, and from children to parents, and place it in the right person's work view. What initiates the work Process Flow Control to start against the Work Order?
A. adding a Classification
B. changing the Status
C. adding a job Plan
D. selecting a Work Type
正解:B
質問 2:
What should be considered for data entry. When a multi-language IBM Maximo Asset Management V7.1 (MAM) environment is being designed?
A. Each language requires a separate EAR file to be deployed in the MAM application server.
B. For each language. existing object attributes should be duplicated and translated in a different language.
C. Multiple languages require multiple language tables for each Maximo Business Object.
D. Each language requires the field label to be translated and entered in each Language specified.
正解:D
質問 3:
A package definition is required to be created that collects data over a nominated period of time including inserts, updates, and deletions. This package must first be approved and activated to collect datA. Which type of package is being described?
A. snapshot package
B. Migration package
C. Change package
D. Life cycle package
正解:C
質問 4:
What represents a Meter type?
A. Automatic
B. Incremental
C. Cumulative
D. Gauge
正解:D
質問 5:
What are the standard location types in IBM Maximo Asset Management V7.1?
A. Storeroom, Operating, Work, Salvage, and Labor
B. Operating, Holding, Vendor, Shop, and Labor
C. Storeroom, Courier, Work, Salvage, and Holding
D. Operating, Storeroom, Vendor, Holding, and Repair
正解:D
質問 6:
What are three of the applications in the Resource Module? (Choose three.)
A. Labor
B. Tools
C. Crafts
D. Service Items
E. Qualifications
F. Calendars
正解:A,C,E
質問 7:
Which default range Ct values does IBM Maximo Asset Management V7.1 use to define priorities for Work Orders, Assets, and Location records?
A. bet.veenOand9
B. between 0 and 999
C. betweenOand99
D. between 0 and 9999
正解:B
質問 8:
Which three statements are true about configurations versus customizations in IBM Maximo Asset Management V7.1 (MAM)? (Choose three)
A. They are easier to test.
B. They can contain complicated SQL statements.
C. They always contain logic.
D. They are quicker to make in MAM.
E. They are upgradable with a new release of MAM.
F. They are supported by IBM support.
正解:B,E,F
質問 9:
Which two statements describe Maximo Locations? (choose two)
A. Maximo Locations are restrlcted to entities having physical and geo-spatial boundaries.
B. Maximo Locations define places where a company expends resources and tracks costs.
C. Maximo Locations can be readily created, modified, or deleted.
D. Maximo Locations define places where assets are operated or stored.
E. Maximo Locations must contain a physical index like a postal address, a room number, or a plant sectionID.
正解:B,D