Which two methods are used to join nodes in a WorI11ow process? (Choose two.)
A. Use a markup tool to join me nodes.
B. Use a positive connector to join me nodes.
C. Drag and drop one node on top of another
D. Use a negative connector to join me nodes.
E. Select one node, and men the other and choose "join.
正解:B,D
質問 2:
What is the life cycle for a Migration Manager package?
A. Define, Create, Distribute, and Deploy.
B. Design, Approve, Populate, and Distribute.
C. Create, Define, Distribute, and Deploy.
D. Create, Approve, Activate, and Distribute.
正解:A
質問 3:
Work Process Flow Control is set of business rules built into the work management applications that allow status changes to be processed automatically in a work hierarchy - from parents to children, between siblings, and from children to parents, and place it in the right person's work view. What initiates the work Process Flow Control to start against the Work Order?
A. adding a Classification
B. changing the Status
C. adding a job Plan
D. selecting a Work Type
正解:B
質問 4:
At which level are Master Preventive Maintenance records defined?
A. Site
B. Organization
C. System
D. Job
正解:C
質問 5:
Which two are considered as an add-on functionality in IBM Maximo Asset Management V7.1? (Choose two.)
A. Linear Assets management
B. contract management
C. asset purchasing management
D. service level agreement management
E. document management
正解:A,D
質問 6:
Which two methods are available to migrate data from a legacy system to IBM Maximo Asset Management V7.1 (MAM)? (Choose two)
A. Use a data mapping tool to link the legacy database to the MAM data warehouse and update the MAMdata.
B. Restore the legacy database on the MAM database server, connect MAM to the legacy database , andreorganize the tables, views, and fields.
C. Connect the legacy database to the MAM database and synchronize the required data by using anexternal data mapping tool.
D. Extract data from thelegacysystem to comma-separated value files and use the data Import option of theIntegration Framework.
E. Extract data from the legacy system and create SQL statements to insert the data directly into the MAMdatabase.
正解:D,E
質問 7:
One or more solutions for each functional gap now have been identified where the solution requires one to vary from using standard IBM Maximo Asset Management V7.1. Which two factors are used to calculate the impact of each solution for the project success? (Choose two)
A. Risk to business
B. Priority
C. Urgency
D. Difficulty to implement
E. Length
正解:A,D
質問 8:
The client requirements outline the need for advanced tracking of process measurements such as temperature, pressure, and flow. These measurement and test equiqment requirements are determined to exceed standard IBM Maximo Asset Management capabilities. Which industry solution or add-on will provide this and other features?
A. Maximo for Service Providers
B. Maximo Linear Assets
C. Maximo Callbration
D. Maximo Instruments and Controls
正解:C
椎名** -
仕上げの模擬試験としてもご活用できますね。すごくいいです。C2010-005に合格できました。